References

YEARSTATUSCLIENTLOCATIONSCOPE OF WORKPROJECT DESCRIPTION
2020IN PROGRESSSAIPEMNIGERIADETAIL DESIGNBONNY ISLAND LNG PROJECT
2020IN PROGRESSSAIPEMMOZAMBIQUE DETAIL DESIGNMOZAMBIQUE LNG PROJECT
2020IN PROGRESSRAFFINERIA DI MILAZZO S.C.p.A.MILAZZO REFINERY (ITALY)FEED (Front End Engineering Design)FEEDING SYSTEM FOR VEGETABLE OILS TO GASOIL HYDROTREATING UNIT
2020IN PROGRESSENIPROGETTIVENICE REFINERY (ITALY)FEASIBILITY STUDYBLUE HYDROGEN PROJECT. NEW HYDROGEN GENERATION PLANT (50,000 NM3/H) INCLUDING CO2 CAPTURE SYSTEM
2020IN PROGRESSENI AngolaLUANDA REFINERY (ANGOLA)DETAIL ENGINEERINGDEBOTTLENECKING OF EXISTING LP FUEL GAS NETWORK AND NEW MP FUEL GAS PIPELINE (6" X 1 KM) TO THE NEARBY POWER STATION TO FEED THE FG TO THE GAS TURBINES
2020COMPLETEDVERSALISCRESCENTINO (ITALY)FEED (Front End Engineering Design)PRODUCTION OF BIO-METHANE BY UPGRADING OF BIOGAS PRODUCED FROM WASTES OF BIO-ETHANOL PRODUCTION PLANT
2020COMPLETEDSARPOMSARROCH REFINERY (ITALY)DETAIL ENGINEERINGDETAIL ENGINEERING FOR REPLACEMENT OF LEGACY BURNERS OF HEATER F3101 WITH NEW ULTRA LOW-NOX BURNERS
2020COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)SUPERVISION SERVICESMULTIDISCIPLINARY SUPERVISION SERVICES DURING MAJOR TURNAROUND OF THE FOLLOWING REFINERY UNITS: TOPPING 1, FCC, ALKYLATION, SOUR WATER STRIPPER, BLOW DOWN
2020COMPLETEDORLEN POLUDNIEJEDLICZE (POLAND)TECHNICAL ADVISORY SERVICES TECHNOLOGY COMPARISON AND LICENSOR SELECTION FOR THE NEW 750,000 MTPY METHANOL PLANT
2020COMPLETEDORLEN POLUDNIETRZEBINIA (POLAND)FEASIBILITY STUDYNEW PLANT FOR RECOVERY OF METALS (NI, V, MO) FROM WASTE CATALYSTS
2020COMPLETEDMATRICAPORTO TORRES (ITALY)FEED (Front End Engineering Design)GREEN MONOMER GRANULATION UNIT
2020COMPLETEDGNL ITALIAPANIGAGLIA LNG TERMINAL, FEZZANO (SP)EP ENGINEERING AND PROCUREMENT OF MATERIALS FOR REFURBISHING OF EXISTING LNG LOADING ARMS
2020COMPLETEDENIPOWERFERRERA ERBOGNONE (ITALY)FEASIBILITY STUDYENERGY STORAGE SYSTEM BASED ON THERMAL BATTERIES (ENERGY NEST TECHNOLOGY)
2020COMPLETEDENIPROGETTIITALYTECHNICAL ADVISORY SERVICESCOLD EYE REVIEW OF BASIC DESIGN PACKAGE FOR NEW WASTE TO METHANOL PLANT
2020COMPLETEDENIPROGETTIPORTO MARGHERA (ITALY)FEED (Front End Engineering Design)NEW PLANT, BASED ON ENI'S PROPRIETARY TECHNOLOGY, FOR PRODUCTION OF 150 KT/Y OF BIO-OIL FROM THE ORGANIC FRACTION OF MUNICIPAL SOLID WASTES
2020COMPLETEDENI AngolaLUANDA REFINERY (ANGOLA)PROCESS STUDYASSESSMENT OF THE EXISTING REFINERY FUEL GAS SYSTEM IN ORDER TO HANDLE THE ADDITIONAL FUEL GAS PRODUCED IN THE NEW PLATFORMING UNIT
2020COMPLETEDENI AngolaLUANDA REFINERY (ANGOLA)DETAIL ENGINEERINGREPLACEMENT OF LEGACY BURNERS WITH NEW ULTRA LOW NOX BURNERS ON N.5 PROCESS HEATERS
2020COMPLETEDENI S.p.A.VENICE REFINERY (ITALY)ASSETT INTEGRITY STUDYASSESSMENT BY FEM ANALYSIS OF STRUCTURAL STABILIT OF 42" CRUDE OIL SEALINE BETWEEN ISOLA DEI PETROLI AND SAN LEONARDO
2020COMPLETEDENI S.p.A.LIVORNO REFINERY (ITALY)ASSETT INTEGRITY STUDYASSESSMENT OF OPERATING CONDITIONS OF CRUDE DISTILLATION UNIT HEATER(F2) WITH NEW FEEDSTOCK IN ORDER TO INSURE COMPLIANCE WITH DESIGN CONDITIONS AND ACTUAL MECHANICAL CONDITIONS OF THE EQUIPMENT
2019IN PROGRESSSACBO (Società per l'Aeroporto Civile di Bergamo Orio al Serio)ORIO AL SERIO INTERNATIONAL AIRPORT (ITALY)FEED, DETAIL DESIGN, CONSTRUCTION MANAGEMENT SERVICESNEW JET FUEL A-1 DEPOT AND IN-FIELD FUEL DISTRIBUTION SYSTEM
2019COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION SERVICESALKYLATION UNIT: REPLACEMENT OF UPPER SECTION AND OVERHEAD REFLUX DRUM OF DEPROPANIZER COLUMN; REPLACEMENT OF HF REDITILLATION COLUMN; REPLACEMENT OF INTERFERING PIPING LINES
2019COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)DETAIL ENGINEERING AND SUPERVISIONE SERVICES SOUR WATER STRIPPER UNIT: IMPLEMENTATION OF IMPROVEMENTS
2019COMPLETEDSAIPEMHOMA (UGANDA)BASIC DESIGNALBERTINE GRABEN REFINERY PROJECT: UTILITIES AND OFFSITES SYSTEMS, I.E. TANK FARM, FUEL GAS, WASTE WATER TREATMENT PLANT, FLARE
2019COMPLETEDSAIPEMHOMA (UGANDA)FEED (Front End Engineering Design)ALBERTINE GRAVEL REFINERY PROJECT: DIESEL HYDROTREATING (UNIT 11) AND RFCC GASOLINE HYDROTREATING (UNIT 13)
2019COMPLETEDSAIPEMSRIRACHA (THAILAND)DETAIL ENGINEERINGTHAI OIL REFINERY PROJECT: MULTIDISCIPLINARY ENGINEERING SERVICES FOR SEVERAL REFINERY UNITS
2019COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A.MILAZZO REFINERY (ITALY)BASIC DESIGNREVAMPING OF DESALTER T4 BY INSTALLATION OF MUD WASHING SYSTEM
2019COMPLETEDMAEITALY/RUSSIADETAIL ENGINEERING MECHANICAL DESIGN FOR CONSTRUCTION OF N.8 DISTILLATION COLUMN AND N. 32 S&T HEAT EXCHANGERS FOR PAN PRECURSOR PLANT
2019COMPLETEDENIPROGETTIITALYFEASIBILITY STUDYPRODUCTION OF GREEN METHANOL FROM SYNGAS GENERATED FROM BIOGAS AMD GREEN HYDROGEN GENERATED BY ELECTROLYSIS
2019COMPLETEDENI Angola / Sonangol EPLUANDA REFINERY (ANGOLA)FEASIBILITY STUDY + BASIC DESIGNOFF-GAS RECOVERY AND REUSE AT VACUUM DISTILLATION UNIT (UN-600) TO PREVENT H2S EMISSIONS IN THE ATMOSPHERE. THE RECOVERED OFF-GAS IS BURNT INTO THE VDU FIRED-HEATER H-601.
2019COMPLETEDENI S.p.A.VENICE REFINERY (ITALY)BASIC DESIGNPRE-TREATMENT UNIT FOR USED COOKING OIL (UCO) AND UNCONVENTIONAL FEEDSTOCKS AT ECOFINING PLANT FOR PRODUCTION OF HYDROGENATED VEGETABLE OILS (HVO).
2019COMPLETEDENI S.p.A.VENICE REFINERY (ITALY)BASIC DESIGNREVAMPING OF BITUMEN LOADING BAYS
2019COMPLETEDENI S.p.A.TARANTO REFINERY (ITALY)FEASIBILITY STUDY + BASIC DESIGNREVAMPING OF FIRED-HEATERS AT HOT OIL UNIT AND CRUDE DISTILLATION UNIT
2019COMPLETEDENI S.p.A.TARANTO REFINERY (ITALY)FEASIBILITY STUDY BYPASS OF TOWER C1401 AT VISBREAKING UNIT.
2019COMPLETEDENI S.p.A.LIVORNO REFINERY (ITALY)ASSETT INTEGRITY STUDYROOT CAUSE ANALYSIS OF CORROSION ISSUES IN THE CRUDE DISTILLATION UNIT OVERHEAD CIRCUIT
2019COMPLETEDENI S.p.A.LIVORNO REFINERY (ITALY)ASSETT INTEGRITY STUDYROOT CAUSE ANALYSIS OF CORROSION ISSUES IN THE SOUR WATER STRIPPER COLUMN BOTTOM SECTION
2019COMPLETEDENI S.p.A.SANNAZZARO REFINERY (ITALY)BASIC DESIGNIMPROVEMENT OF THE HOT REFLUX SYSTEM AT THE EXISTING VACUUM DISTILLATION UNIT (VACUUM 1)
2019COMPLETEDENI S.p.A.SANNAZZARO REFINERY (ITALY)PROCESS STUDYOPTIMIZATION OF LVGO RECOVERY FROM FCC CLARIFIED OIL (CLO)
2019COMPLETEDENI S.p.A.TARANTO REFINERY (ITALY)BASIC DESIGNLAYOUT MODIFICATION OF WEMCO FLOTATION UNIT AT WASTE WATER TREATMENT PLANT (TAS)
2019COMPLETEDENI S.p.A.TARANTO REFINERY (ITALY)BASIC DESIGNNEW VAPOUR RECOVEY SYSTEM FOR SHIPS LOADING
2019COMPLETEDENI S.p.A.TARANTO REFINERY (ITALY)BASIC DESIGNVAPOUR RECOVERY UNITS INTERCONNECTING SYSTEM
2019COMPLETEDENI S.p.A.TARANTO REFINERY (ITALY)BASIC DESIGNSCRUBBING SYSTEM FOR BITUMEN VAPOURS RELEASED DURING VESSELS LOADING
2019COMPLETEDENI S.p.A.TARANTO REFINERY (ITALY)BASIC DESIGNNEW MULTISTAGE DESALTER
2019COMPLETEDENI S.p.A.LIVORNO REFINERY (ITALY)BASIC DESIGNIMPROVEMENTS AT DEOLING SECTION OF THE WASTE WATER TREATMENT PLANT
2019COMPLETEDENI S.p.A.VENICE REFINERY (ITALY)FEASIBILITY STUDY, FEEDSUBSEA HYDROGEN PIPELINE DN" 6 BY GUIDE HORIZONTAL DRILLING, FROM PORTO MARGHERA PETROCHEMICAL COMPLEX TO VENICE REFINERY
2018-2020COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)FEASIBILITY STUDY, FEED, DETAIL ENGINEERING AND SUPERVISION SERVICESINSTALLATION OF 4TH STAGE CICLONES AND NEW HOT CATALYST DISCHARGE SYSTEM AT FCC PLANT
2018COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)BASIC, DETAIL DESIGN, SUPERVISION SERVICES NEW CRUDE OIL TRANSFER LINES FROM REFINERY JETTY TO CRUDE OIL TANK FARM, TRV DISCHARGE SYSTEM AND REFURBISHMENT OF CRUDE OIL TANKS AND CRUDE OIL PUMPING STATION
2018COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)BASIC, DETAIL DESIGN, SUPERVISION SERVICES REPLACEMENT OF N.2. TWIN LOBE TYPE AIR COMPRESSORS WITH N.2 NEW SCREW COMPRESSORS EQUIPPED WITH VFD
2018COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)BASIC, DETAIL DESIGN, SUPERVISION SERVICES NEW AMINE WASH TOWER (T-1)
2018COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)DETAIL DESIGNREFURBISHING OF LV DISTRIBUTION OF ELECTRICAL HEATING SYSTEMS ON CRUDE AND PRODCUTS PIPELINES AT REFINERY JETTY
2018COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)FEED (Front End Engineering Design)EXPANSION OF OS-1 ELECTRICAL SUBSTATION
2018COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)FEED, DETAIL ENGINEERING AND EQUIPMENT INSPECTION AND TESTING, SUPERVISION SERVICESREPLACEMENT OF N. 4 REACTORS AND FLUE GAS DUCTS OF PROCESS HEATERS AT CATALYTIC REFORMING PLANT
2018COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A.MILAZZO REFINERY (ITALY)FEED, PREPARATION OF TENDER DOCUMENTS FOR EPCNEW HYDROGEN RECOVERY UNIT (PSA2) FROM REFINERY OFF-GAS
2018COMPLETEDPKN ORLENPLOCK REFINERY (POLAND)BASIC DESIGN, DETAIL DESIGN, CONSTRUCTION SUPERVISION GREEN MONOMERS PRODUCTION PLANT. DEBOTTLENECKING OF N.2 PROCESS UNITS (U-2100, U-2200).
2018COMPLETEDPKN ORLENPLOCK REFINERY (POLAND)FEASIBILITY STUDYNEW 100,000 MTPY TAEE (TERT-AMYL-ETHYL ETHER) PRODUCTION PLANT
2018COMPLETEDMATRICAPORTO TORRES (ITALY)BASIC DESIGN, DETAIL DESIGN, CONSTRUCTION SUPERVISION GREEN MONOMERS PRODUCTION PLANT. DEBOTTLENECKING OF N.2 PROCESS UNITS (U-2100, U-2200)
2018COMPLETEDMATRICAPORTO TORRES (ITALY)BASIC DESIGN, PREPARATION OF TENDER DOCUMENT FOR EPCNEW LPG FIRED-BOILER FOR GENERATION OF LOW-PRESSURE STEAM
2018COMPLETEDENIPROGETTIBURUN OIL FIELD, TURKMENISTANFEASIBILITY STUDYOPTIMIZATION OF CONDENSATE RECOVERY
2018COMPLETEDENI AngolaLUANDA REFINERY (ANGOLA)FEASIBILITY STUDYEFFICIENCY IMPROVEMENT AND EMISSIONS REDUCTION OF N.8 PROCESS HEATERS
2018COMPLETEDENI Angola / Sonangol EPLUANDA REFINERY (ANGOLA)FEASIBILITY STUDY + BASIC DESIGN + DETAIL DESIGNRECOVERY SYSTEM OF COOLING WATER STREAMS LOST TO DRAIN
2018COMPLETEDENI Angola / Sonangol EPLUANDA REFINERY (ANGOLA)FEASIBILITY STUDYASSESSMENT AND DEBOTTLENECKING OF CRUDE DISTILLATION UNIT UN-150 AND RECOVERY UNIT UN-550, IN ORDER TO PROCESS THE INCREASED QUANTITY OF GASOLINE AND LPG PRODUCED BY THE NEW PLATFORMING UNIT
2018COMPLETEDENI Angola / Sonangol EPLUANDA REFINERY (ANGOLA)FEASIBILITY STUDYDEBOTTLENECKING OF REFINERY COOLING WATER INTAKE SYSTEM
2018COMPLETEDENI S.p.A.SANNAZZARO REFINERY (ITALY)BASIC DESIGNNEW WATER INJECTION SYSTEM TO PREVENT AMMONIUM SALTS DEPOSITION IN THE EQUIPMENT OF THE GASOLINE DESULPHURIZATION UNITS
2018COMPLETEDENI S.p.A.SANNAZZARO-MALPENSA JET FUEL PIPELINE (ITALY)PROCESS STUDYASSESSMENT OF OPERATING CONDITIONS FOR TRANSPORT OF JET FUEL OVER THE SANNAZZARO REFINERY TO MALPENSA AIRPORT PIPELINE
2018COMPLETEDENI S.p.A.SANNAZZARO REFINERY (ITALY)FEASIBILITY STUDYNEW GASOLINE STABILIZER COLUMN.
2017-2018COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION SERVICESREPLACEMENT OF 150 KV AIS (AIR INSULATED SWITCHYARD)
2017COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)BASIC DESIGNPROCESS IMPROVEMENTS ON VISBREAKING OFF-GAS WASHING SYSTEM
2017COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)FEED (Front End Engineering Design)INSTALLATION OF N.2 NEW LJUNGSTROM AIR PRE-HEATERS AT REFINERY POWER STATION
2017COMPLETEDSAIPEMOKPAI (NIGERIA)DETAIL ENGINEERINGOKPAI POWER STATION CAPACITY INCREASE: 480 MW TO 960 MW
2017COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A.MILAZZO (ME), ITALYFEASIBILTY STUDY, BASIC DESIGN, FEED AND COST ESTIMATEUTILITIES AND OFFSITES FOR FOD PROJECT: TANK FARM, FLARE, ELECTRICAL SUBSTATION, ROADS AND INFRASTRUCTURES
2017COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A.MILAZZO (ME), ITALYPMC SERVICESFOD PROJECT. HYDROGEN PRODUCTION BY GASSIFICATION OF REFINERY RESIDUES.
2017COMPLETEDENI S.p.A.LIVORNO REFINERY (ITALY)BASIC DESIGNIMPLEMENTATION OF IMPROVEMENTS AT REFINERY JETTIES FOR OPTIMIZATION OF VESSELS LOADING/UNLOADING TIME
2017COMPLETEDENI S.p.A.EGYPTPROCESS ENGINEERINGDEBOTTLENECKING OF ACID GAS REMOVAL UNIT, SULPHUR RECOVERY UNIT AND TAIL GAS TREATMENT, ZOHR PROJECT
2017COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYFEASIBILITY STUDYREPLACEMENT OF AIR-PREHEATEARS AT POWER GENERATION PLANT (CTE)
2017COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYBASIC ENGINEERINGUPGRADING OF MERCAPTAN REMOVAL FROM FUEL GAS AT VISBREAKING PLANT
2017COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYDETAILED ENGINEERINGDESIGN FOR THE NEW H2S REMOVAL TOWER, CCR PLANT
2017COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYDETAILED ENGINEERINGREPLACEMENT OF REFORMING REACTORS AND HEATERS MANIFOLDS, CCR PLANT
2017COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYPROCESS ENGINEERINGREPLACEMENT OF REFORMING REACTORS AND HEATERS MANIFOLDS, CCR PLANT
2017COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYPROCESS ENGINEERINGDEBOTTLENECKING OF COOLING WATER NETWORK, SOUTH PLANTS
2017COMPLETEDENI S.p.A.PRIOLO, ITALYBASIC ENGINEERINGPACKAGE FOR REVAMPING OF THE EXISTING WATER TREATMENT PLANT (TAS)
2017COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A. MILAZZO (ME), ITALYFEED (Front End Engineering Design)FUEL OIL DESTRUCTION (FODS) PROJECT SITE PREPARATION WORKS (TANKS DISMANTLING, FLARE RELOCATION, NEW ELECTRICAL SUBSTATION,….)
2017COMPLETEDCASALE RUSSIAMULTIDISCIPLINARY ENGINEERINGMETAFRAX PROJECT (AMMONIA/UREA/MELAMINE COMPLEX)
2016-2019COMPLETEDSARLUX S.r.l.SARROCH REFINERY (ITALY)BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION TO INSTALLATIONREVAMPING OF ELECTRICAL SUBSTATIONS AT NORTH AND SOUTH PLANTS (JOB CARRIED OUT IN FOUR STEPS DURING 2016, 2017, 2018 AND 2019 TURNAORUNDS), INCLUDING:
- REPLACEMENT OF MV SWITCHBOARDS
- INSTALLATION OF MV VFD ON BOILER BLOWERS
- REPLACEMENT OF LV SWITCHBOARDS (PC, MCC, AUXILIARY SERVICES)
- INSTALLATION OF ELECTRICAL SCADA, UPS AND PROTECTION SWITCHBOARDS
- INSTALLATION OF ELECTRICAL CABLES
- CIVIL WORKS
2016COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A. MILAZZO (ME), ITALYPROJECT MENAGEMENT AND CONSULTING SERVICESFUEL OIL DESTRUCTION (FODS) PROJECT
2016COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYDETAILED ENGINEERINGENERGY INTEGRATION BETWEEN MILD HYDROCRACKING UNIT (MHC) AND GASOLINE ETHERIFICATION UNIT (TAME)
2016COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYDETAILED ENGINEERINGPROJECT FOR 150 KV ELECTRICAL SUBSTATION
2016COMPLETEDBIO-ON ITALYFEASIBILITY STUDY1,500 MTPY POLYHYDROXYALKANOATES (PHA) BIO-PLASTIC PRODUCTION PLANT FROM GLYCEROL FEEDSTOCK
2016COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A. MILAZZO (ME), ITALYFEASIBILITY STUDY & BASIC ENGINEERINGRELOCATION OF EXISTING FLARE
2016COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYFEED (Front End Engineering Design) & BASIC ENGINEERINGNEW H2S REMOVAL TOWER, CCR PLANT
2016COMPLETEDTECNOMARE / ENI S.p.A.KAZAKHSTANFEED (Front End Engineering Design)KARACHAGANAK SOUR GAS LIQUIDS TREATMENT PROJECT
2016COMPLETEDTECNIMONTMALAYSIADETAILED ENGINEERINGHDPE PLANT, RAPID PROJECT
2016COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYBASIC ENGINEERINGUPGRADING AND REVAMPING OF EXISTING BLOW-DOWN AND FLARE SYSTEM
2016COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYBASIC ENGINEERING & SERVICESUPGRADING OF H2S REMOVAL SYSTEM (AMINE SYSTEM)
2016COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYDETAILED ENGINEERINGREPLACEMENT OF LOADING ARMS AT NORTH PLANTS MARINE TERMINAL
2015COMPLETEDABB S.p.A.TUNISIAMULTIDISCIPLINARY ENGINEERINGNAWARA GAS TREATMENT PLANT
2015COMPLETEDABB S.p.A.ALGERIAFEED (Front End Engineering Design)REVAMPING OF PRODUCTION SATELLITES AT HASSI MESSAOUD FIELD
2015COMPLETEDSAIPEM / ENI S.p.AEGYPTDETAILED ENGINEERINGONSHORE EARLY PRODUCTION FACILITIES, ZOHR PROJECT
2015COMPLETEDSiirtec NigiKAZAKHSTANDETAILED ENGINEERINGNEW GAS TREATMENT UNIT, ZHAIKMUNAI PLANT
2015COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A.MILAZZO (ME), ITALYBASIC ENGINEERINGNEW 10,000 BPSD NAPHTHA HYDROTREATING UNIT (HDT-3
2015COMPLETEDSARASSARROCH (CA), ITALYDETAILED ENGINEERINGREVAMPING OF PROPYLENE RECOVERY, SEPARATION AND STORAGE AT NORTH AND SOUTH PLANTS
2015COMPLETEDTECNOMARE S.p.A.CONGOFEED (Front End Engineering Design)NENÈ FIELD DEVELOPMENT PROJECT (PP1, AEP, RISER, WHP3 PLATFORMS)
2015COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYDETAILED ENGINEERINGREPLACEMENT OF ELECTRICAL PROTECTION SWITCHBOARDS 150/33/6 KV
2015COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYDETAILED ENGINEERINGREPLACEMENT OF FCC BLOWER DRIVER FROM STEAM TURBINE TO ELECTRICAL MOTOR
2015COMPLETEDSARLUX S.r.l.SARROCH (CA), ITALYBASIC ENGINEERINGUPGRADING OF FIREFIGHTING SYSTEM AT NORTH PLANTS JETTY
2015COMPLETEDIRIS/Consorzio Industriale SassariITALYFEASIBILITY STUDYLNG STORAGE AT PORTO TORRES
2014COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A.ITALYENGINEERING, PROCUREMENT & COSTRUCTION (EPC/LSK Contract)REVAMPING OF KEROSENE HYDRODESULPHURIZATION UNIT (HDS-1)
2014COMPLETEDPACIFIC FUTURE ENERGY Co.BRITISH COLUMBIA, CANADAPREFEASIBILITY STUDY200,000 BPSD GREENFIELD REFINERY
2014COMPLETEDUNITED PETROCHEMSOHAR, OMANPREFEASIBILITY STUDYNEW CONDENSATE DESULPHURIZATION PLANT
2014COMPLETEDSARASSARROCH (CA), ITALYFEASIBILITY STUDYNEW SCRUBBER FOR FCC FLUE GAS DESULPHURIZATION
2014COMPLETEDSARASSARROCH (CA), ITALYBASIC ENGINEERINGTHERMAL INTEGRATION BETWEEN MILD HYDROCRACKING (MHC) AND NEW SEA WATER DESALTER (DAM
2014COMPLETEDVERSALISRAVENNA, ITALYBASIC ENGINEERINGCONSTRUCTION OF ETBE/BUTENE-1 PLANT AT RAVENNA PETROCHEMICAL COMPLEX
2014COMPLETEDIES (MOL Group)ITALYFEASIBILITY STUDYREVAMPING THE RAILROAD UNLOADING FACILITIES AT MANTOVA REFINERY
2014COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYBASIC AND DETAILED ENGINEERINGREVAMPING OF FURFURAL PLANT (FT-2) TO TDAE PRODUCTION. LIVORNO REFINERY
2013COMPLETEDSARASSARROCH (CA), ITALYDETAILED ENGINEERINGNEW OXYGEN LINE (6’’ X 600 M) FOR OXYGEN ENRICHMENT SYSTEM, FCC PLAN
2013COMPLETEDENI S.p.A. Div. REFINING & MARKETINGVENICE, ITALYFEED (Front End Engineering Design)REVAMPING OF THE LOGISTICS ASSETS, VENICE REFINERY
2013COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYPROCESS ENGINEERINGDEBOTTLENECKING OF THE COOLING WATER NETWORK AT SANNAZZARO AND TARANTO REFINERIES
2013COMPLETEDVERSALISMALAYSIAENGINEERINGFEED OF ELASTOMER PLANTS (S-SBR, E-SBR, EPDM, SBS), RAPID PROJECT
2013COMPLETEDSAIPEMNORTH DAKOTA, USAFEED (Front End Engineering Design)AMMONIA PLANT, SPIRITWOOD PROJECT
2013COMPLETEDSAIPEMCASPIAN SEA, KAZAHSTANINSTRUMENTATION & AUTOMATISAIONDRILLING AND PRODUCTION CLUSTERS EPC2, EPC3, EPC4
2013COMPLETEDE.ON MIRA/ADRIA, ITALYENGINEERINGRELOCATION OF SOLAR TAURUS 70 GAS TURBINE
2013COMPLETEDSARASSARROCH (CA), ITALYFEED (Front End Engineering Design)ENERGY INTEGRATION BETWEEN MILD HYDROCRACKING (MHC) AND GASOLINE ETHERIFICATION UNIT (TAME)
2013COMPLETEDSARASSARROCH (CA), ITALYBASIC ENGINEETING & FEED (Front End Engineering Design)DEBOTTLENECKING OF TOPPING RT2 UNIT
2013COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A.ITALYFEED (Front End Engineering Design)REVAMPING OF THE KEROSENE HYDRODESULPHURIZATION UNIT (HDS-1)
2013COMPLETEDURS/Adriatic LNGITALYFEED (Front End Engineering Design)NEW WASTE WATER TREATMENT PLANT
2013COMPLETEDURS/Adriatic LNGITALYOPERATIVE MAINTANCE SERVICESADRIATIC LNG REGASSIFICATION TERMINAL
2013COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYFEED (Front End Engineering Design)REVAMPING OF THE WASTE WATER TREATMENT PLANT, LIVORNO REFINERY,
2013COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYFEED (Front End Engineering Design)NEW TREATED DISTILLATE AROMATIC EXTRACT (TDAE) PLANT AT LIVORNO REFINERY
2013COMPLETEDRAFFINERIA DI GELAITALYBASIC AND DETAILED ENGINEERINGINSTALLATION OF NEW ULTRA LOW NOX BURNERS ON FIRED HEATERS, GELA REFINERY
2013COMPLETEDSAIPEMNIGERIADETAILED ENGINEERINGDANGOTE AMMONIA/UREA COMPLEX
2013COMPLETEDVERSALISSARROCH (CA), ITALYBASIC ENGINEERINGNEW FLARE GAS RECOVERY UNIT, SARROCH PETROCHEMICAL COMPLEX
2012COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYFEED (Front End Engineering Design) & DETAILED ENGINEERINGNEW HYDROGEN PRODUCTION UNIT BASED ON ENI’S PROPRIETARY SCT-CPO TECHNOLOGY, SANNAZZARO DE’ BURGONDI REFINERY
2012COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYFEASIBILITY STUDYNEW TREATED DISTILLATE AROMATIC EXTRACT (TDAE) PLANT, LIVORNO REFINERY
2012COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYTECHNICAL ASSESMENTEXISTING TANK FARM FOR STORAGE OF RAW VEGETABLE OILS AND BIODIESEL AND FRONT END ENGINEERING DESIGN OF THE RELEVANT REVAMPING - GREEN REFINERY PROJECT, VENICE REFINERY
2012COMPLETEDVERSALISSARROCH (CA), ITALYPROCESS STUDYBLOW DOWN SYSTEMS AFTER THE INSTALLATION OF NEW PROCESS UNITS, SARROCH PETROCHEMICAL COMPLEX
2012COMPLETEDVERSALISITALYBASIC ENGINEERINGNEW COMMERCIAL DEMONSTRATION PLANT FOR THE PRODUCTION OF TACKIFYING RESINS
2012COMPLETEDSAIPEMCANADAFEED (Front End Engineering Design)NORTH WEST RED WATER LC FINER RESIDUES CONVERSION UNIT
2011COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYENGINEERING, PROCUREMENT & COSTRUCTION (EPC/LSTK Contract)NEW VACUUM COLUMN AND FILTRATION SYSTEM OF FCC CLARIFIED OIL, SANNAZZARO DE’ BURGUNDI REFINERY
2011COMPLETEDENI S.p.A. Div. REFINING & MARKETINGROBASSOMERO, ITALY FEED (Front End Engineering Design) & BASIC ENGINEERINGPROPRIETARY SPECIALTY CHEMICAL PRODUCTION UNIT (XD23)
2011COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYDETAILED ENGINEERING AND PROCUREMENT SERVICESNEW WATER REUSE UNIT BASED ON ULTRA-FILTRATION AND REVERSE OSMOSIS TECHNOLOGIES, SANNAZZARO DE BURGUNDI REFINERY
2011COMPLETEDDANIELI Far EastFAR EASTDETAILED ENGINEERING, PROCUREMENT SERVICES & HOME OFFICE SERVICESNEW 10,000 NM3/H CARBON DIOXIDE REMOVAL UNIT
2011COMPLETEDENIPOWERITALYBASIC ENGINEERING & COST ESTIMATEINSTALLATION OF A NEW STEAM BOILER (160 MWT) AT RAVENNA POWER PLANT
2011COMPLETEDPOLIMERI EUROPAITALYBASIC ENGINEERING & COST ESTIMATEINSTALLATION OF N.2 NEW HP STEAM BOILERS (2 X 150 T/H), PORTO MARGHERA PETROCHEMICAL COMPLEX
2010COMPLETEDENI S.p.A. Div. REFINING & MARKETINGADRIATIC SEA, ITALYFRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTSEPC FOR FAUZIA, ELETTRA AND BENEDETTA PLATFORMS
2010COMPLETEDTMPCTUNISIAFEASIBILITY STUDY, BASIC DESIGN AND RISK ANALYSISMETHANOL STORAGE AND INJECTION UNIT FOR INHIBITION OF HYDRATE FORMATION IN THE TRANS MEDITERRANEAN PIPELINE, CAP BON TERMINAL
2010COMPLETEDURS/Adriatic LNGITALYFEASIBILITY STUDY & BASIC ENGINEERINGWOBBE INDEX CORRECTION SYSTEMS AT ADRIATIC LNG TERMINAL
2010COMPLETEDTAMOILITALYDETAILED ENGINEERINGCHLORIDE REMOVAL UNIT UPSTREAM OF THE CONTINUOUS CATALYTIC REFORMING UNIT (CCR), CREMONA REFINERY
2010COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYENGINEERING, PROCUREMENT & COSTRUCTION (EPC Contract)NEW 1 KM X 4” SKIN-EFFECT ELECTRICALLY TRACED LIQUID SULPHUR TRANSFER LINE AND REVAMPING OF ASSOCIATED UNITS, TARANTO REFINERY
2009COMPLETEDENIPOWERITALYFRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTSEPC FOR THE REVAMPING OF BOLGIANO COMBINED HEAT & POWER PLANT (140 MWTH), S. DONATO MILANESE
2009COMPLETEDBONATTI S.p.A.ITALYMULTIDISCIPLINARY ENGINEERINGNEW UTILITY WATER SYSTEMS AT NC-115 GOSP "A", GOSP "B" & CCX INDUSTRIAL AREA AND NC-186 GOSP "A”, – FINAL CLIENT: AKAKUS OIL
2009COMPLETEDENIPOWERITALYFEED (Front End Engineering Design)N.2 PHOTOVOLTAIC PLANTS AT TARANTO (1 MWE) AND FERRANDINA (4 MWE)
2009COMPLETEDSAIPEMITALYMULTIDISCIPLINARY ENGINEERINGEST (ENI SLURRY TECHNOLOGY) PLANT AT SANNAZZARO REFINERY - FINAL CLIENT: ENI R&M DIV
2009COMPLETEDSIRAM S.p.A.ITALYCONCEPTUAL DESIGN & COST ESTIMATENR. 2 BIOMASS FIRED POWER PLANTS (14 MW AND 10 MW)
2009COMPLETEDSAIPEM ENERGY SERVICESTURKMENISTANDESIGN REVIEW & BASIC ENGINEERINGGAS OIL SEPARATION PLANT, BURUN OIL FIELD - FINAL CLIENT: ENI E&P DIV.
2008COMPLETEDSNAMPROGETTIQATARMULTIDISCIPLINARY ENGINEERINGAMMONIA & UREA PLANTS, QAFCO 5 PROJECT, MESAIEED - FINAL CLIENT: QATAR FERTILIZERS CO.
2008COMPLETEDTECNIMONTITALYBASIC ENGINEERINGBIOMASS FIRED POWER PLANT, OLEVANO LOMELLINA
2008COMPLETEDENI Oil Co. LtdLYBIARISK ANALYSIS & ASSESSMENT STUDYOUT OF SERVICE OF GAS SWEETENING UNIT DP4 OFFSHORE PLATFORM, BOURI FIELD
2008COMPLETEDBONATTI S.p.A.LYBIADETAILED ENGINEERINGWATER INJECTION SYSTEM UPGRADING AT NC-115 EL SHARARA GOSP “B” - FINAL CLIENT: AKAKUS OIL
2008COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYENGINEERING, PROCUREMENT & COSTRUCTION (EPC Contract)C4 BUTYLENIC STREAM DRYER PACKAGE, SANNAZZARO DE’ BURGONDI REFINERY
2007COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A.ITALYENGINEERING, PROCUREMENT & COSTRUCTION (EPC\LSTK Contract)PIER 2 / MOORING 06 BIS: MARINE LOADING ARMS REVAMPING AND REPLACEMENT, MILAZZO REFINERY IN PARTNERSHIP WITH I.F.A. SRL AND FMC TECHNOLOGIES
2007COMPLETEDSAIPEM ENERGY INT. CONGOPROCESS ENGINEERINGREVAMPING AND MODIFICATIONS OF KITINA PLATFORM TOP SIDE FACILITIES - FINAL CLIENT: ENI E&P DIV.
2007COMPLETEDCO.ME.CF s.r.l.ITALYDETAILED ENGINEERING12 T POWER BOILERS SUBSTITUTION WITH 3.5 MW POWER BOILERS/ SOLAR CENTAURO 55 TURBOGAS AT ROBASSOMERO PLANT - FINAL CLIENT: ENI R&M DIV.
2007COMPLETEDPOLIMERI EUROPASARROCH (CA), ITALYENGINEERING, PROCUREMENT & COSTRUCTION (EPC\LSTK Contract)WASTE WATER TREATMENT PLANT (TAS) COVERING SYSTEM AND VAPOUR RECOVERY CRYOGENIC CONDENSATION UNIT SYSTEM, SARROCH PETROCHEMICAL COMPLEX
2007COMPLETEDSNAMPROGETTIPAKISTANMULTIDISCIPLINARY ENGINEERINGAMMONIA & UREA UNITS, ENGRO PROJECT - FINAL CLIENT: ENGRO CHEMICALS CO.
2007COMPLETEDTECNIMONTCHILEBASIC ENGINEERING & DETAILED ENGINEERINGBOCAMINA II 370 MWE COAL FIRED POWER PLANT, PUERTO CORONEL - FINAL CLIENT: ENDESA
2006COMPLETEDSNAMPROGETTIITALYMULTIDISCIPLINARY ENGINEERINGTARANTO PLUS REFINERY EXPANSION PROJECT (TOPPING/VACUUM; LPG TREATMENT PACKAGE; AUXILIARY; INTERCONNECTING, GASOIL HDS) - FINAL CLIENT: ENI R&M DIV.
2006COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYPROCESS ENGINEERINGNEW SOUR WATER STRIPPER AT LIVORNO REFINERY
2006COMPLETEDENI S.p.A. Div. REFINING & MARKETINGROBASSOMERO, ITALY FEASIBILITY STUDYREPLACEMENT OF STEAM GENERATORS AT EXISTING POWER PLANT
2006COMPLETEDENI S.p.A. Div. EXPLORATION & PRODUCTIONOKPAI, NIGERIAFRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTSEPC FOR THE EXPANSION OF NAOC ELECTRICAL POWER PLANT
2006COMPLETEDSNAMPROGETTIITALYMACHINERY ENGINEERING AND PACKAGES TECHNICAL FOLLOW-UPISOCRACKER PLANT AND ASSOCIATED UNITS, SANNAZZARO DE’ BURGONDI REFINERY – FINAL CLIENT: ENI R&M DIV.
2006COMPLETEDTECNIMONTNIZHNEKAMSK, RUSSIAMULTIDISCIPLINARY ENGINEERINGNKNK LLDPE / HDPE PROJECT
2006COMPLETEDSAIPEM ENERGY INT.CONGOPROCESS ENGINEERING DESIGN & FIREFIGHTING STUDYLITCHENDJLI AND BANGA PLATFORMS - FINAL CLIENT: ENI E&P DIV.
2006COMPLETEDSAIPEM ENERGY INT.CASPIAN SEA, KAZAHSTANPROCESS ENGINEERINGH2S REMOVAL, KALAMAKAS PROJECT - FINAL CLIENT: ENI E&P DIV.
2006COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYFEED (Front End Engineering Design)NEW GPL DESULPHURIZATION UNIT, VENEZIA REFINERY
2006COMPLETEDNORAHAN SANAYE IRANBASIC ENGINEERING & DETAILED ENGINEERINGUTILITIES & OFFSITES, ILAM PETROCHEMICAL COMPLEX
2006COMPLETEDSNAMPROGETTI TURKEYCONCEPTUAL DESIGN &FEEDTRANS ANATOLIAN PIPELINE (TAP) INCLUDING SAMSUN MARINE TERMINAL (BLACK SEA), CEYHAN MARINE TERMINAL (MEDITERRANEAN SEA) , NPS 48” OIL PIPELINE, TRANS ANATOLIAN PIPELIN - FINAL CLIENT: ENI E&P. DIV.
2005COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A. MILAZZO (ME), ITALYTURN KEY JOBPIER 2 – N. 4X16” MARINE LOADING ARMS DISMANTLING AND REPLACED WITH N. 3X16” LOADING ARMS - PERFORMED IN PARTNERSHIP WITH IFA SRL & FMC TECHNOLOGIES
2005COMPLETEDENGINEERING & MANAGEMENT SERVICESKARACHAGANAK, KAZAKHSTANFEED (Front End Engineering Design)COMMERCIAL DEMONSTRATION PLANT FOR H2S REMOVAL - FINAL CLIENT: ENI E&P DIV.
2005COMPLETEDTECNOMARECONGOFIRE-FIGHTING STUDYLITCHENDJLI AND BANGA PLATFORM - FINAL CLIENT: ENI E&P DIV.
2005COMPLETEDRAFFINERIA DI MILAZZO S.C.p.A.MILAZZO (ME), ITALYFEASIBILITY STUDY & BASIC ENGINEERINGVAPOUR RECOVERY UNIT (VRU) AT JETTY # 2
2005COMPLETEDSAIPEM ENERGY INT.CONGOPROCESS ENGINEERING DESIGN AWA/PALOUKOU PLATFORM - FINAL CLIENT: ENI E&P. DIV.
2005COMPLETEDENI Oil Co. LtdLYBIAFEASIBILITY STUDY, FEED & PREPARATION OF TENDER DOCUMENTSEPC FOR THE WATER INJECTION SYSTEM & POWER GENERATION SYSTEM, ELEPHANT OIL FIELD
2005COMPLETEDSNAMPROGETTIVARIOUS (MORROCO, SAUDI ARABIA, QATAR, UAE, ENGINEERINGSAMIR UP-GRADE PROJECT - MOHAMMEDIA (MOROCCO).
CCR PLATFORMER & LRSN ISOMERIZATION PLANT – YANBU (SAUDI ARABIA)
RAS LAFFAN LPG – PHASE 2 FEED – RAS LAFFAN (QATAR)
NGL – RUWAIS (UAE)
2005COMPLETEDSNAMPROGETTIITALYMULTIDISCIPLINARY ENGINEERINGISOCRACKER PLANT AND AUXILIARY UNITS – SANNAZZARO REFINERY – FINAL CLIENT: ENI R&M DIV.
2005COMPLETEDENI S.p.A. Div. EXPLORATION & PRODUCTION/NAOCOKPAI, NIGERIAPREPARATION OF TENDER DOCUMENTSEPC FOR NEW 18” GAS PIPELINE KWALE
2005COMPLETEDENI S.p.A. Div. EXPLORATION & PRODUCTION/NAOCPISTICCI, ITALYMULTIDISCIPLINARY ENGINEERINGNEW OIL WELLS 13 & 19
2005COMPLETEDSTOGITITALYMULTIDISCIPLINARY ENGINEERINGGAS COMPRESSION PLANTS AT CORTEMAGGIORE, SETTALA, CINISELLO BALSAMO, RIPALTA, SERGNANO, MINERBIO
2004COMPLETEDENI S.p.A. Div. EXPLORATION & PRODUCTIONOKPAI, NIGERIAFRONT END ENGINEERING DESIGN (FEED) AND PREPARATION OF TENDER DOCUMENTSSUPPLY AND INSTALLATION OF A 3MW POWER PLANT FOR LOCAL COMMUNITY
2004COMPLETEDRAFFINERIA DI GELAITALYENGINEERING, PROCUREMENT & COSTRUCTION (EPC\LSTK Contract)REVAMPING THE INSTRUMENTATION AND CONTROL SYSTEM OF THE WASTE WATER TREATMENT PLANT, GELA REFINERY
2004COMPLETEDFMC Energy SystemNOYABRSK, RUSSIABASIC ENGINEERINGLPG RAILWAY LOADING STATION
2004COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYBASIC ENGINEERINGENERGY SAVING ON TOPPING 1 AND VACUUM PLANT, SANNAZZARO DE’ BURGONDI REFINERY
2004COMPLETEDENI S.p.A. Div. EXPLORATION & PRODUCTION/NAOCBRASS, NIGERIA PREPARATION OF TENDER DOCUMENTSEPC FOR 18” OIL PIPELINE TEBIDABA
2004COMPLETEDENI S.p.A. Div. EXPLORATION & PRODUCTION/NAOCNIGERIAFOLLOW-UP AND CHECK OF THE TECHNICAL DOCUMENTS ISSUED FOR CONSTRUCTION BY THE EPC CONTRACTOR24” GAS PIPELINE OGBAINBIRI – OB/OB
2004COMPLETEDITALPROGETTIITALYSTUDYPIER MODIFICATIONS TO ALLOW THE MOORING OF SHIPS WITH 65.000 / 70.000 TON DGW, PANIGAGLIA LNG REGASSIFICATION TERMINAL - FINAL CLIENT: SNAM
2003COMPLETEDSNAMPROGETTI SUDITALYDETAILED ENGINEERINGFCC GASOLINE HDS PLANT AT SANNAZZARO DE’ BURGONDI REFINERY - FINAL CLIENT: ENI R&M DIV.
2003COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYFEASIBILITY STUDY & COST ESTIMATEN. 8 ENI PETROLEUM PRODUCTS TERMINAL
2003COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYFEASIBILITY STUDY & COST ESTIMATENEW MARINE TERMINAL IN GAETA
2003COMPLETEDENI S.p.A. Div. REFINING & MARKETINGITALYBASIC ENGINEERINGENI MARINE PETROLEUM PRODUCTS TERMINAL IN VIBO VALENTIA
2003COMPLETEDPRAOILITALYDETAILED ENGINEERINGGRAN SAN BERNARDO SERVICE TUNNEL RELOCATION
2003COMPLETEDPRAOILITALYDETAILED ENGINEERINGGENUA DEBOTTLENECKING PROJECT
2003COMPLETEDGENUA PORT AUTHORITYITALYFEASIBILITY STUDYRATIONALIZATION OF PETROLEUM PRODUCTS DISPATCH AT GENUA HARBOUR
2003COMPLETEDALSTOM POWER
BOILERS
NIGERIAELECTRO-INSTRUMENTAL ENGINEERING3D MODELLING FOR THE OKPAI POWER PLANT
2002COMPLETEDAgip PetroliITALYBASIC ENGINEERING & COST ESTIMATEWAX VACUUM PLANT REVAMPING PROJECT AT LIVORNO REFINERY
2002COMPLETEDSNAMPROGETTIITALYDETAILED ENGINEERINGTHIRD METHANOL PLANT, BANDAR IMAM
2002COMPLETEDAgip Oil Co.LtdLYBIAFEASIBILITY STUDYINSTALLATION OF A NEW REGENERATION GAS COMPRESSOR INSTALLATION, NGL RECOVERY PLANT
2002COMPLETEDSNAMPROGETTIITALYENGINEERING, PROCUREMENT & COSTRUCTION (EPC Contract)TOPPING 2 (UNIT 10) REVAMPING AT SANNAZZARO DE’ BURGONDI REFINERY - FINAL CLIENT: AGIP PETROLI
2000-2001COMPLETEDPRAOILITALYRATIONALIZATION DESIGN STUDYAGIP AND IPLOM PRODUCTS DISTRIBUTION IN GENUA
2000-2001COMPLETEDVISCOLUBEITALYFEASIBILITY STUDY, FEED, DETAIL ENGINEERING, COST ESTIMATE, PROCUREMENT, INSPECTION AND EXPEDITING OF MATERIALSNEW LUBE OIL RE-REFINING (HYDRO-FINISHING) PLANT AND OFF-SITES REVAMPING AT PIEVE FISSIRAGA REFINERY
2000-2001COMPLETEDSIRTE OIL COMPANYLYBIAENGINEERINGGAS LIFT PROJECT INCLUDING GAS LIFT COMPRESSION, METHANOL & CHEMICAL INHIBITOR INJECTION SKIDS, TRUNK LINES AND FLOWLINES, RAGUBA,
2000-2001COMPLETEDENELPOWERCASTLEFORD, UNITED KINGDOM MULTIDISCIPLINARY ENGINEERINGCOMBINED HEAT & POWER PLANT – FINAL CLIENT: HICKSON & WELCH LTD