PROJECT CATEGORY | PROJECT DESCRIPTION | SCOPE OF WORK | YEAR | CLIENT | LOCATION | STATUS |
---|---|---|---|---|---|---|
DOWNSTREAM/ PETRO- CHEMICALS | UTILITIES AND OFFSITES OF A NEW 500,000 MTPY HDPE PLANT | FEED (Front End Engineering Design) | 2021 | SAIPEM | CHINA | IN PROGRESS |
DOWNSTREAM/ REFINING | NEW REFINERY CONFIGURATION AFTER SEPARATION OF FUELS AND LUBE PLANTS | FEED (Front End Engineering Design) | 2021 | ENI S.p.a. | LIVORNO REFINERY (ITALY) | IN PROGRESS |
RENEWABLE ENERGIES/ ENERGY TRANSITION | DISTILLATION OF A BIO-NAPHTHA STREAM TO PRODUCE BIO-JET USING AN EXISTING IDLE DISTILLATION COLUMN | PROCESS STUDY | 2021 | ENI S.p.a. | LIVORNO REFINERY (ITALY) | IN PROGRESS |
RENEWABLE ENERGIES/ ENERGY TRANSITION | DEBOTTLENECKING OF THE GAS RECOVERY SECTION TO ALLOW PRODUCTION OF BIOJET | PROCESS STUDY | 2021 | RAFFINERIA DI GELA | GELA REFINERY (ITALY) | IN PROGRESS |
DOWNSTREAM/ CHEMICAL | NEW PHOSPHORIC ACID SCRUBBING SYSTEM | DETAIL DESIGN | 2021 | ITELYUM PURIFICATION | LANDRIANO (ITALY) | IN PROGRESS |
MIDSTREAM/ UNDERGROUND GAS STORAGE | NEW NITROGEN PRODUCTION UNIT | PROJECT MANAGEMENT SERVICES | 2021 | ITALGAS STORAGE | CORNEGLIANO LAUDENSE | IN PROGRESS |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW PELARGONIC ACID HYDROGENATION UNIT | DETAIL DESIGN | 2021 | MATRICA | PORTO TORRES (ITALY) | IN PROGRESS |
MIDSTREAM/ LOGISTIC HUB | CONVERSION OF THE EXISTING FUEL DEPOT INTO A LOGISTIC HUB | BASIC DESIGN | 2021 | SIGEMI | ARQUATA SCRIVIA (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF EXISTING GASOIL HYDRODESULPHURIZATION UNIT (U-400) | CONSTRUCTA- BILITY STUDY | 2021 | ISAB/LUKOIL | PRIOLO REFINERY (ITALY) | COMPLETED |
POWER | ENERGY THERMAL STORAGE FOR CCGT PLANTS - COMPARISON OF DIFFERENT THERMAL STORAGE MEDIA | FEASIBILITY STUDY | 2021 | ENIPOWER | ITALY | COMPLETED |
UPSTREAM/OIL | PLANT MODIFICATIONS TO BE IMPLEMENTED DURING THE MAJOR TURNAROUND OF THE OIL CENTER | DETAIL DESIGN | 2021 | ENIPROGETTI | VIGGIANO (ITALY) | COMPLETED |
UPSTREAM/ OFFSHORE PLATFORM | SABRATHA PLATFORM MODIFICATION PROJECT | DETAIL DESIGN | 2021 | ENIPROGETTI | LIBYA | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | BLUE HYDROGEN PROJECT. NEW HYDROGEN GENERATION PLANT (50,000 NM3/H), BY STEAM REFORMING OF NATURAL GAS, INCLUDING CO2 CAPTURE SYSTEM | FEASIBILITY STUDY | 2021 | ENIPROGETTI | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | ASSESSMENT OF THE IMPACT OF THE NEW STEAM REFORMER UNIT ON THE EXISTING BD SYSTEM | PROCESS STUDY | 2021 | ENI S.p.a. | VENICE REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | NEW REFINERY CONFIGURATION FOR SEPARATION OF FUELS AND LUBE PRODUCTION | FEED (Front End Engineering Design) | 2021 | ENI S.p.a. | LIVORNO REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | FREE PALM OIL PROJECT - MODIFICATION OF REFINERY LOGISTIC ASSETS TO ALLOW STORAGE AND HANDLING OF SECOND GENERATION BIO-FEEDSTOCKS | BASIC DESIGN | 2021 | ENI S.p.a. | VENICE REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | NEW PLANT FOR COMPRESSION AND LOADING OF GREEN H2 ON TUBE TRAILERS (CAPACITY: 800 Nm3/h) | FEASIBILITY STUDY | 2021 | SAPIO | ITALY | COMPLETED |
DOWNSTREAM/ TECHNICAL GASES | NEW PLANT FOR PRODUCTION OF HIGH PURITY NITROGEN | PROJECT MANAGEMENT SERVICES | 2021 | SAPIO | ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | SEMI-INDUSTRIAL PLANT FOR PRODUCTION OF SUBSTITUTE NATURAL GAS FROM GREEN HYDROGEN AND CO2 | FEASIBILITY STUDY | 2021 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | DEMO PLANT FOR PRODUCTION OF SUBSTITUTE NATURAL GAS FROM GREEN HYDROGEN AND CO2 | FEASIBILITY STUDY | 2021 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | ASSESSMENT OF SITES FOR PRODUCTION FOR HYDROELECTRIC POWER | TECHNICAL ADVISORY SERVICES | 2021 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PRETREATMENT OF WASTE VEGETABLE OILS (e.g. USED COOKING OIL AND PALM OIL MILL EFFLUENT) FOR PRODUCTION OF BIOFUELS | FEASIBILITY STUDY | 2021 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | GOFINATE PLANT - NEW ENERGY INTEGRATION PROJECT | BASIC DESIGN | 2020 | ISAB/LUKOIL | PRIOLO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | UPDATE OF BASIC DESIGN FOR REVAMPING OF THE EXISTING WASTE WATER TREATMENT PLANT | BASIC DESIGN | 2020 | ISAB/LUKOIL | PRIOLO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | BALANCE OF PLANT OF THE NEW ELECTROSTATIC FILTER FOR FCC CLARIFIED OIL (CLO) | BASIC DESIGN | 2020 | ISAB/LUKOIL | PRIOLO REFINERY (ITALY) | COMPLETED |
MIDSTREAM/LNG | BONNY ISLAND LNG PROJECT | DETAIL DESIGN | 2020 | SAIPEM | NIGERIA | IN PROGRESS |
MIDSTREAM/LNG | MOZAMBIQUE LNG PROJECT | DETAIL DESIGN | 2020 | SAIPEM | MOZAMBIQUE | IN PROGRESS |
POWER | NEW ELECTRICAL SUBSTATION SS51bis | BASIC DESIGN | 2020 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW PROCESS HEATER FOR KEROSENE HYDRODESULPHURIZATION UNIT (HDS-1) | BASIC DESIGN | 2020 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | FEEDING SYSTEM FOR VEGETABLE OILS TO GASOIL HYDROTREATING UNIT | FEED (Front End Engineering Design) | 2020 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO REFINERY (ITALY) | IN PROGRESS |
RENEWABLE ENERGIES/ENERGY TRANSITION | BLUE HYDROGEN PROJECT. NEW HYDROGEN GENERATION PLANT (50,000 NM3/H) INCLUDING CO2 CAPTURE SYSTEM | FEASIBILITY STUDY | 2020 | ENIPROGETTI | VENICE REFINERY (ITALY) | IN PROGRESS |
DOWNSTREAM/ REFINING | DEBOTTLENECKING OF EXISTING LP FUEL GAS NETWORK AND NEW MP FUEL GAS PIPELINE (6" X 1 KM) TO THE NEARBY POWER STATION TO FEED THE FG TO THE GAS TURBINES | DETAIL DESIGN | 2020 | ENI Angola | LUANDA REFINERY (ANGOLA) | IN PROGRESS |
RENEWABLE ENERGIES/ENERGY TRANSITION | PRODUCTION OF BIO-METHANE BY UPGRADING OF BIOGAS PRODUCED FROM WASTES OF BIO-ETHANOL PRODUCTION PLANT | FEED (Front End Engineering Design) | 2020 | VERSALIS | CRESCENTINO (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | DETAIL ENGINEERING FOR REPLACEMENT OF LEGACY BURNERS OF HEATER F3101 WITH NEW ULTRA LOW-NOX BURNERS | DETAIL DESIGN | 2020 | SARPOM | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | MULTIDISCIPLINARY SUPERVISION SERVICES DURING MAJOR TURNAROUND OF THE FOLLOWING REFINERY UNITS: TOPPING 1, FCC, ALKYLATION, SOUR WATER STRIPPER, BLOW DOWN | SUPERVISION SERVICES | 2020 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ CHEMICAL | TECHNOLOGY COMPARISON AND LICENSOR SELECTION FOR THE NEW 750,000 MTPY METHANOL PLANT | TECHNICAL ADVISORY SERVICES | 2020 | ORLEN POLUDNIE | JEDLICZE (POLAND) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW PLANT FOR RECOVERY OF METALS (NI, V, MO) FROM WASTE CATALYSTS | FEASIBILITY STUDY | 2020 | ORLEN POLUDNIE | TRZEBINIA (POLAND) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | GREEN MONOMER GRANULATION UNIT | FEED (Front End Engineering Design) | 2020 | MATRICA | PORTO TORRES (ITALY) | COMPLETED |
MIDSTREAM/ LNG | ENGINEERING AND PROCUREMENT OF MATERIALS FOR REFURBISHING OF EXISTING LNG LOADING ARMS | EP | 2020 | GNL ITALIA | PANIGAGLIA LNG TERMINAL, FEZZANO (SP) | COMPLETED |
POWER | ENERGY STORAGE SYSTEM BASED ON THERMAL BATTERIES (ENERGY NEST TECHNOLOGY) | FEASIBILITY STUDY | 2020 | ENIPOWER | FERRERA ERBOGNONE (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | COLD EYE REVIEW OF BASIC DESIGN PACKAGE FOR NEW WASTE TO METHANOL PLANT | TECHNICAL ADVISORY SERVICES | 2020 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW PLANT, BASED ON ENI'S PROPRIETARY TECHNOLOGY, FOR PRODUCTION OF 150 KT/Y OF BIO-OIL FROM THE ORGANIC FRACTION OF MUNICIPAL SOLID WASTES | FEED (Front End Engineering Design) | 2020 | ENIPROGETTI | PORTO MARGHERA (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | ASSESSMENT OF THE EXISTING REFINERY FUEL GAS SYSTEM IN ORDER TO HANDLE THE ADDITIONAL FUEL GAS PRODUCED IN THE NEW PLATFORMING UNIT | PROCESS STUDY | 2020 | ENI Angola | LUANDA REFINERY (ANGOLA) | COMPLETED |
DOWNSTREAM/ REFINING | REPLACEMENT OF LEGACY BURNERS WITH NEW ULTRA LOW NOX BURNERS ON N.5 PROCESS HEATERS | DETAIL DESIGN | 2020 | ENI Angola | LUANDA REFINERY (ANGOLA) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW CO2 CAPTURE UNIT (300 MTPD) DOWNSTREAM OF THE EXISTING STEAM METHANE REFORMING UNIT | FEASIBILITY STUDY | 2020 | ENI S.p.A. | SANNAZZARO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | ASSESSMENT BY FEM ANALYSIS OF STRUCTURAL STABILIT OF 42" CRUDE OIL SEALINE BETWEEN ISOLA DEI PETROLI AND SAN LEONARDO | ASSETT INTEGRITY STUDY | 2020 | ENI S.p.A. | VENICE REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | ASSESSMENT OF OPERATING CONDITIONS OF CRUDE DISTILLATION UNIT HEATER(F2) WITH NEW FEEDSTOCK IN ORDER TO INSURE COMPLIANCE WITH DESIGN CONDITIONS AND ACTUAL MECHANICAL CONDITIONS OF THE EQUIPMENT | ASSETT INTEGRITY STUDY | 2020 | ENI S.p.A. | LIVORNO REFINERY (ITALY) | COMPLETED |
MIDSTREAM/ AVIO FUEL DEPOT | NEW JET FUEL A-1 DEPOT AND IN-FIELD FUEL DISTRIBUTION SYSTEM | FEED, DETAIL DESIGN, CONSTRUCTION MANAGEMENT SERVICES | 2019 | SACBO (Società per l'Aeroporto Civile di Bergamo Orio al Serio) | ORIO AL SERIO INTERNATIONAL AIRPORT (ITALY) | IN PROGRESS |
DOWNSTREAM/ REFINING | ALKYLATION UNIT: REPLACEMENT OF UPPER SECTION AND OVERHEAD REFLUX DRUM OF DEPROPANIZER COLUMN; REPLACEMENT OF HF REDITILLATION COLUMN; REPLACEMENT OF INTERFERING PIPING LINES | BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION SERVICES | 2019 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | SOUR WATER STRIPPER UNIT: IMPLEMENTATION OF IMPROVEMENTS | DETAIL ENGINEERING AND SUPERVISIONE SERVICES | 2019 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | ALBERTINE GRABEN REFINERY PROJECT: UTILITIES AND OFFSITES SYSTEMS, I.E. TANK FARM, FUEL GAS, WASTE WATER TREATMENT PLANT, FLARE | BASIC DESIGN | 2019 | SAIPEM | HOMA (UGANDA) | COMPLETED |
DOWNSTREAM/ REFINING | ALBERTINE GRAVEL REFINERY PROJECT: DIESEL HYDROTREATING (UNIT 11) AND RFCC GASOLINE HYDROTREATING (UNIT 13) | FEED (Front End Engineering Design) | 2019 | SAIPEM | HOMA (UGANDA) | COMPLETED |
DOWNSTREAM/ REFINING | THAI OIL REFINERY PROJECT: MULTIDISCIPLINARY ENGINEERING SERVICES FOR SEVERAL REFINERY UNITS | DETAIL DESIGN | 2019 | SAIPEM | SRIRACHA (THAILAND) | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF DESALTER T4 BY INSTALLATION OF MUD WASHING SYSTEM | BASIC DESIGN | 2019 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ CHEMICAL | MECHANICAL DESIGN FOR CONSTRUCTION OF N.8 DISTILLATION COLUMN AND N. 32 S&T HEAT EXCHANGERS FOR PAN PRECURSOR PLANT | DETAIL DESIGN | 2019 | MAE | ITALY/RUSSIA | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PRODUCTION OF GREEN METHANOL FROM SYNGAS GENERATED FROM BIOGAS AMD GREEN HYDROGEN GENERATED BY ELECTROLYSIS | FEASIBILITY STUDY | 2019 | ENIPROGETTI | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | OFF-GAS RECOVERY AND REUSE AT VACUUM DISTILLATION UNIT (UN-600) TO PREVENT H2S EMISSIONS IN THE ATMOSPHERE. THE RECOVERED OFF-GAS IS BURNT INTO THE VDU FIRED-HEATER H-601. | FEASIBILITY STUDY + BASIC DESIGN | 2019 | ENI Angola / Sonangol EP | LUANDA REFINERY (ANGOLA) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PRE-TREATMENT UNIT FOR USED COOKING OIL (UCO) AND UNCONVENTIONAL FEEDSTOCKS AT ECOFINING PLANT FOR PRODUCTION OF HYDROGENATED VEGETABLE OILS (HVO). | BASIC DESIGN | 2019 | ENI S.p.A. | VENICE REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF BITUMEN LOADING BAYS | BASIC DESIGN | 2019 | ENI S.p.A. | VENICE REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF FIRED-HEATERS AT HOT OIL UNIT AND CRUDE DISTILLATION UNIT | FEASIBILITY STUDY + BASIC DESIGN | 2019 | ENI S.p.A. | TARANTO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | BYPASS OF TOWER C1401 AT VISBREAKING UNIT. | FEASIBILITY STUDY | 2019 | ENI S.p.A. | TARANTO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | ROOT CAUSE ANALYSIS OF CORROSION ISSUES IN THE CRUDE DISTILLATION UNIT OVERHEAD CIRCUIT | ASSETT INTEGRITY STUDY | 2019 | ENI S.p.A. | LIVORNO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | ROOT CAUSE ANALYSIS OF CORROSION ISSUES IN THE SOUR WATER STRIPPER COLUMN BOTTOM SECTION | ASSETT INTEGRITY STUDY | 2019 | ENI S.p.A. | LIVORNO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | IMPROVEMENT OF THE HOT REFLUX SYSTEM AT THE EXISTING VACUUM DISTILLATION UNIT (VACUUM 1) | BASIC DESIGN | 2019 | ENI S.p.A. | SANNAZZARO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | OPTIMIZATION OF LVGO RECOVERY FROM FCC CLARIFIED OIL (CLO) | PROCESS STUDY | 2019 | ENI S.p.A. | SANNAZZARO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | LAYOUT MODIFICATION OF WEMCO FLOTATION UNIT AT WASTE WATER TREATMENT PLANT (TAS) | BASIC DESIGN | 2019 | ENI S.p.A. | TARANTO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | NEW VAPOUR RECOVEY SYSTEM FOR SHIPS LOADING | BASIC DESIGN | 2019 | ENI S.p.A. | TARANTO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | VAPOUR RECOVERY UNITS INTERCONNECTING SYSTEM | BASIC DESIGN | 2019 | ENI S.p.A. | TARANTO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | SCRUBBING SYSTEM FOR BITUMEN VAPOURS RELEASED DURING VESSELS LOADING | BASIC DESIGN | 2019 | ENI S.p.A. | TARANTO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | NEW MULTISTAGE DESALTER | BASIC DESIGN | 2019 | ENI S.p.A. | TARANTO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | IMPROVEMENTS AT DEOLING SECTION OF THE WASTE WATER TREATMENT PLANT | BASIC DESIGN | 2019 | ENI S.p.A. | LIVORNO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | SUBSEA HYDROGEN PIPELINE DN" 6 BY GUIDE HORIZONTAL DRILLING, FROM PORTO MARGHERA PETROCHEMICAL COMPLEX TO VENICE REFINERY | FEASIBILITY STUDY, FEED | 2019 | ENI S.p.A. | VENICE REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | INSTALLATION OF 4TH STAGE CICLONES AND NEW HOT CATALYST DISCHARGE SYSTEM AT FCC PLANT | FEASIBILITY STUDY, FEED, DETAIL ENGINEERING AND SUPERVISION SERVICES | 2018-2020 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | NEW CRUDE OIL TRANSFER LINES FROM REFINERY JETTY TO CRUDE OIL TANK FARM, TRV DISCHARGE SYSTEM AND REFURBISHMENT OF CRUDE OIL TANKS AND CRUDE OIL PUMPING STATION | BASIC, DETAIL DESIGN, SUPERVISION SERVICES | 2018 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | REPLACEMENT OF N.2. TWIN LOBE TYPE AIR COMPRESSORS WITH N.2 NEW SCREW COMPRESSORS EQUIPPED WITH VFD | BASIC, DETAIL DESIGN, SUPERVISION SERVICES | 2018 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | NEW AMINE WASH TOWER (T-1) | BASIC, DETAIL DESIGN, SUPERVISION SERVICES | 2018 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | REFURBISHING OF LV DISTRIBUTION OF ELECTRICAL HEATING SYSTEMS ON CRUDE AND PRODCUTS PIPELINES AT REFINERY JETTY | DETAIL DESIGN | 2018 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | EXPANSION OF OS-1 ELECTRICAL SUBSTATION | FEED (Front End Engineering Design) | 2018 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | REPLACEMENT OF N. 4 REACTORS AND FLUE GAS DUCTS OF PROCESS HEATERS AT CATALYTIC REFORMING PLANT | FEED, DETAIL ENGINEERING AND EQUIPMENT INSPECTION AND TESTING, SUPERVISION SERVICES | 2018 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | NEW HYDROGEN RECOVERY UNIT (PSA2) FROM REFINERY OFF-GAS | FEED, PREPARATION OF TENDER DOCUMENTS FOR EPC | 2018 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | GREEN MONOMERS PRODUCTION PLANT. DEBOTTLENECKING OF N.2 PROCESS UNITS (U-2100, U-2200). | BASIC DESIGN, DETAIL DESIGN, CONSTRUCTION SUPERVISION | 2018 | PKN ORLEN | PLOCK REFINERY (POLAND) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | GREEN MONOMERS PRODUCTION PLANT. DEBOTTLENECKING OF N.2 PROCESS UNITS (U-2100, U-2200) | BASIC DESIGN, DETAIL DESIGN, CONSTRUCTION SUPERVISION | 2018 | MATRICA | PORTO TORRES (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW LPG FIRED-BOILER FOR GENERATION OF LOW-PRESSURE STEAM | BASIC DESIGN, PREPARATION OF TENDER DOCUMENT FOR EPC | 2018 | MATRICA | PORTO TORRES (ITALY) | COMPLETED |
UPSTREAM/OIL | OPTIMIZATION OF CONDENSATE RECOVERY | FEASIBILITY STUDY | 2018 | ENIPROGETTI | BURUN OIL FIELD, TURKMENISTAN | COMPLETED |
DOWNSTREAM/ REFINING | EFFICIENCY IMPROVEMENT AND EMISSIONS REDUCTION OF N.8 PROCESS HEATERS | FEASIBILITY STUDY | 2018 | ENI Angola | LUANDA REFINERY (ANGOLA) | COMPLETED |
DOWNSTREAM/ REFINING | RECOVERY SYSTEM OF COOLING WATER STREAMS LOST TO DRAIN | FEASIBILITY STUDY + BASIC DESIGN + DETAIL DESIGN | 2018 | ENI Angola | LUANDA REFINERY (ANGOLA) | COMPLETED |
DOWNSTREAM/ REFINING | ASSESSMENT AND DEBOTTLENECKING OF CRUDE DISTILLATION UNIT UN-150 AND RECOVERY UNIT UN-550, IN ORDER TO PROCESS THE INCREASED QUANTITY OF GASOLINE AND LPG PRODUCED BY THE NEW PLATFORMING UNIT | FEASIBILITY STUDY | 2018 | ENI Angola | LUANDA REFINERY (ANGOLA) | COMPLETED |
DOWNSTREAM/ REFINING | DEBOTTLENECKING OF REFINERY COOLING WATER INTAKE SYSTEM | FEASIBILITY STUDY | 2018 | ENI Angola | LUANDA REFINERY (ANGOLA) | COMPLETED |
DOWNSTREAM/ REFINING | NEW WATER INJECTION SYSTEM TO PREVENT AMMONIUM SALTS DEPOSITION IN THE EQUIPMENT OF THE GASOLINE DESULPHURIZATION UNITS | BASIC DESIGN | 2018 | ENI S.p.A. | SANNAZZARO REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | ASSESSMENT OF OPERATING CONDITIONS FOR TRANSPORT OF JET FUEL OVER THE SANNAZZARO REFINERY TO MALPENSA AIRPORT PIPELINE | PROCESS STUDY | 2018 | ENI S.p.A. | SANNAZZARO-MALPENSA JET FUEL PIPELINE (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | NEW GASOLINE STABILIZER COLUMN. | FEASIBILITY STUDY | 2018 | ENI S.p.A. | SANNAZZARO REFINERY (ITALY) | COMPLETED |
POWER | REPLACEMENT OF 150 KV AIS (AIR INSULATED SWITCHYARD) | BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION SERVICES | 2017-2018 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | PROCESS IMPROVEMENTS ON VISBREAKING OFF-GAS WASHING SYSTEM | BASIC DESIGN | 2017 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | INSTALLATION OF N.2 NEW LJUNGSTROM AIR PRE-HEATERS AT REFINERY POWER STATION | FEED (Front End Engineering Design) | 2017 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | OKPAI POWER STATION CAPACITY INCREASE: 480 MW TO 960 MW | DETAIL DESIGN | 2017 | SAIPEM | OKPAI (NIGERIA) | COMPLETED |
DOWNSTREAM/ REFINING | UTILITIES AND OFFSITES FOR FOD PROJECT: TANK FARM, FLARE, ELECTRICAL SUBSTATION, ROADS AND INFRASTRUCTURES | FEASIBILTY STUDY, BASIC DESIGN, FEED AND COST ESTIMATE | 2017 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO (ME), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | FOD PROJECT. HYDROGEN PRODUCTION BY GASSIFICATION OF REFINERY RESIDUES. | PMC SERVICES | 2017 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO (ME), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | IMPLEMENTATION OF IMPROVEMENTS AT REFINERY JETTIES FOR OPTIMIZATION OF VESSELS LOADING/UNLOADING TIME | BASIC DESIGN | 2017 | ENI S.p.A. | LIVORNO REFINERY (ITALY) | COMPLETED |
UPSTREAM/GAS | DEBOTTLENECKING OF ACID GAS REMOVAL UNIT, SULPHUR RECOVERY UNIT AND TAIL GAS TREATMENT, ZOHR PROJECT | PROCESS ENGINEERING | 2017 | ENI S.p.A. | EGYPT | COMPLETED |
POWER | REPLACEMENT OF AIR-PREHEATEARS AT POWER GENERATION PLANT (CTE) | FEASIBILITY STUDY | 2017 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | UPGRADING OF MERCAPTAN REMOVAL FROM FUEL GAS AT VISBREAKING PLANT | BASIC ENGINEERING | 2017 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | DESIGN FOR THE NEW H2S REMOVAL TOWER, CCR PLANT | DETAILED ENGINEERING | 2017 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REPLACEMENT OF REFORMING REACTORS AND HEATERS MANIFOLDS, CCR PLANT | DETAILED ENGINEERING | 2017 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REPLACEMENT OF REFORMING REACTORS AND HEATERS MANIFOLDS, CCR PLANT | PROCESS ENGINEERING | 2017 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | DEBOTTLENECKING OF COOLING WATER NETWORK, SOUTH PLANTS | PROCESS ENGINEERING | 2017 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
PACKAGE FOR REVAMPING OF THE EXISTING WATER TREATMENT PLANT (TAS) | BASIC ENGINEERING | 2017 | ENI S.p.A. | PRIOLO, ITALY | COMPLETED | |
DOWNSTREAM/ REFINING | FUEL OIL DESTRUCTION (FODS) PROJECT SITE PREPARATION WORKS (TANKS DISMANTLING, FLARE RELOCATION, NEW ELECTRICAL SUBSTATION,….) | FEED (Front End Engineering Design) | 2017 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO (ME), ITALY | COMPLETED |
DOWNSTREAM/ FERTILIZERS & CHEMICALS | METAFRAX PROJECT (AMMONIA/UREA/MELAMINE COMPLEX) | MULTIDISCIPLINARY ENGINEERING | 2017 | CASALE | RUSSIA | COMPLETED |
POWER | REVAMPING OF ELECTRICAL SUBSTATIONS AT NORTH AND SOUTH PLANTS (JOB CARRIED OUT IN FOUR STEPS DURING 2016, 2017, 2018 AND 2019 TURNAORUNDS), INCLUDING: - REPLACEMENT OF MV SWITCHBOARDS - INSTALLATION OF MV VFD ON BOILER BLOWERS - REPLACEMENT OF LV SWITCHBOARDS (PC, MCC, AUXILIARY SERVICES) - INSTALLATION OF ELECTRICAL SCADA, UPS AND PROTECTION SWITCHBOARDS - INSTALLATION OF ELECTRICAL CABLES - CIVIL WORKS | BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION TO INSTALLATION | 2016-2019 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
DOWNSTREAM/ REFINING | FUEL OIL DESTRUCTION (FODS) PROJECT | PROJECT MENAGEMENT AND CONSULTING SERVICES | 2016 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO (ME), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | ENERGY INTEGRATION BETWEEN MILD HYDROCRACKING UNIT (MHC) AND GASOLINE ETHERIFICATION UNIT (TAME) | DETAILED ENGINEERING | 2016 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
POWER | PROJECT FOR 150 KV ELECTRICAL SUBSTATION | DETAILED ENGINEERING | 2016 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | 1,500 MTPY POLYHYDROXYALKANOATES (PHA) BIO-PLASTIC PRODUCTION PLANT FROM GLYCEROL FEEDSTOCK | FEASIBILITY STUDY | 2016 | BIO-ON | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | RELOCATION OF EXISTING FLARE | FEASIBILITY STUDY & BASIC ENGINEERING | 2016 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO (ME), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | NEW H2S REMOVAL TOWER, CCR PLANT | FEED (Front End Engineering Design) & BASIC ENGINEERING | 2016 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
UPSTREAM/GAS | KARACHAGANAK SOUR GAS LIQUIDS TREATMENT PROJECT | FEED (Front End Engineering Design) | 2016 | TECNOMARE / ENI S.p.A. | KAZAKHSTAN | COMPLETED |
DOWNSTREAM/ PETRO-CHEMICALS | HDPE PLANT, RAPID PROJECT | DETAILED ENGINEERING | 2016 | TECNIMONT | MALAYSIA | COMPLETED |
DOWNSTREAM/ REFINING | UPGRADING AND REVAMPING OF EXISTING BLOW-DOWN AND FLARE SYSTEM | BASIC ENGINEERING | 2016 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | UPGRADING OF H2S REMOVAL SYSTEM (AMINE SYSTEM) | BASIC ENGINEERING & SERVICES | 2016 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REPLACEMENT OF LOADING ARMS AT NORTH PLANTS MARINE TERMINAL | DETAILED ENGINEERING | 2016 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
UPSTREAM/GAS | NAWARA GAS TREATMENT PLANT | MULTIDISCIPLINARY ENGINEERING | 2015 | ABB S.p.A. | TUNISIA | COMPLETED |
UPSTREAM/GAS | REVAMPING OF PRODUCTION SATELLITES AT HASSI MESSAOUD FIELD | FEED (Front End Engineering Design) | 2015 | ABB S.p.A. | ALGERIA | COMPLETED |
UPSTREAM/GAS | ONSHORE EARLY PRODUCTION FACILITIES, ZOHR PROJECT | DETAILED ENGINEERING | 2015 | SAIPEM / ENI S.p.A | EGYPT | COMPLETED |
UPSTREAM/GAS | NEW GAS TREATMENT UNIT, ZHAIKMUNAI PLANT | DETAILED ENGINEERING | 2015 | Siirtec Nigi | KAZAKHSTAN | COMPLETED |
DOWNSTREAM/ REFINING | NEW 10,000 BPSD NAPHTHA HYDROTREATING UNIT (HDT-3 | BASIC ENGINEERING | 2015 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO (ME), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF PROPYLENE RECOVERY, SEPARATION AND STORAGE AT NORTH AND SOUTH PLANTS | DETAILED ENGINEERING | 2015 | SARAS | SARROCH (CA), ITALY | COMPLETED |
USPTREAM/OIL/ OFFSHORE | NENÈ FIELD DEVELOPMENT PROJECT (PP1, AEP, RISER, WHP3 PLATFORMS) | FEED (Front End Engineering Design) | 2015 | TECNOMARE S.p.A. | CONGO | COMPLETED |
POWER | REPLACEMENT OF ELECTRICAL PROTECTION SWITCHBOARDS 150/33/6 KV | DETAILED ENGINEERING | 2015 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
POWER | REPLACEMENT OF FCC BLOWER DRIVER FROM STEAM TURBINE TO ELECTRICAL MOTOR | DETAILED ENGINEERING | 2015 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | UPGRADING OF FIREFIGHTING SYSTEM AT NORTH PLANTS JETTY | BASIC ENGINEERING | 2015 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
MIDSTREAM/LNG | LNG STORAGE AT PORTO TORRES | FEASIBILITY STUDY | 2015 | IRIS/Consorzio Industriale Sassari | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF KEROSENE HYDRODESULPHURIZATION UNIT (HDS-1) | ENGINEERING, PROCUREMENT & COSTRUCTION (EPC/LSK Contract) | 2014 | RAFFINERIA DI MILAZZO S.C.p.A. | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | 200,000 BPSD GREENFIELD REFINERY | PREFEASIBILITY STUDY | 2014 | PACIFIC FUTURE ENERGY Co. | BRITISH COLUMBIA, CANADA | COMPLETED |
DOWNSTREAM/ REFINING | NEW CONDENSATE DESULPHURIZATION PLANT | PREFEASIBILITY STUDY | 2014 | UNITED PETROCHEM | SOHAR, OMAN | COMPLETED |
DOWNSTREAM/ REFINING | NEW SCRUBBER FOR FCC FLUE GAS DESULPHURIZATION | FEASIBILITY STUDY | 2014 | SARAS | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | THERMAL INTEGRATION BETWEEN MILD HYDROCRACKING (MHC) AND NEW SEA WATER DESALTER (DAM | BASIC ENGINEERING | 2014 | SARAS | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ PETRO-CHEMICALS | CONSTRUCTION OF ETBE/BUTENE-1 PLANT AT RAVENNA PETROCHEMICAL COMPLEX | BASIC ENGINEERING | 2014 | VERSALIS | RAVENNA, ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING THE RAILROAD UNLOADING FACILITIES AT MANTOVA REFINERY | FEASIBILITY STUDY | 2014 | IES (MOL Group) | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF FURFURAL PLANT (FT-2) TO TDAE PRODUCTION. LIVORNO REFINERY | BASIC AND DETAILED ENGINEERING | 2014 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | NEW OXYGEN LINE (6’’ X 600 M) FOR OXYGEN ENRICHMENT SYSTEM, FCC PLAN | DETAILED ENGINEERING | 2013 | SARAS | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF THE LOGISTICS ASSETS, VENICE REFINERY | FEED (Front End Engineering Design) | 2013 | ENI S.p.A. Div. REFINING & MARKETING | VENICE, ITALY | COMPLETED |
DOWNSTREAM/ REFINING | DEBOTTLENECKING OF THE COOLING WATER NETWORK AT SANNAZZARO AND TARANTO REFINERIES | PROCESS ENGINEERING | 2013 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
DOWNSTREAM/ PETRO-CHEMICALS | FEED OF ELASTOMER PLANTS (S-SBR, E-SBR, EPDM, SBS), RAPID PROJECT | ENGINEERING | 2013 | VERSALIS | MALAYSIA | COMPLETED |
DOWNSTREAM/ FERTILIZERS | AMMONIA PLANT, SPIRITWOOD PROJECT | FEED (Front End Engineering Design) | 2013 | SAIPEM | NORTH DAKOTA, USA | COMPLETED |
UPSTREAM/OIL/ OFFSHORE | DRILLING AND PRODUCTION CLUSTERS EPC2, EPC3, EPC4 | INSTRUMENTATION & AUTOMATISAION | 2013 | SAIPEM | CASPIAN SEA, KAZAHSTAN | COMPLETED |
POWER | RELOCATION OF SOLAR TAURUS 70 GAS TURBINE | ENGINEERING | 2013 | E.ON | MIRA/ADRIA, ITALY | COMPLETED |
DOWNSTREAM/ REFINING | ENERGY INTEGRATION BETWEEN MILD HYDROCRACKING (MHC) AND GASOLINE ETHERIFICATION UNIT (TAME) | FEED (Front End Engineering Design) | 2013 | SARAS | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | DEBOTTLENECKING OF TOPPING RT2 UNIT | BASIC ENGINEETING & FEED (Front End Engineering Design) | 2013 | SARAS | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF THE KEROSENE HYDRODESULPHURIZATION UNIT (HDS-1) | FEED (Front End Engineering Design) | 2013 | RAFFINERIA DI MILAZZO S.C.p.A. | ITALY | COMPLETED |
MIDSTREAM/ GAS/OFFSHORE | NEW WASTE WATER TREATMENT PLANT | FEED (Front End Engineering Design) | 2013 | URS/Adriatic LNG | ITALY | COMPLETED |
MIDSTREAM/ GAS/OFFSHORE | ADRIATIC LNG REGASSIFICATION TERMINAL | OPERATIVE MAINTANCE SERVICES | 2013 | URS/Adriatic LNG | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING OF THE WASTE WATER TREATMENT PLANT, LIVORNO REFINERY, | FEED (Front End Engineering Design) | 2013 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | NEW TREATED DISTILLATE AROMATIC EXTRACT (TDAE) PLANT AT LIVORNO REFINERY | FEED (Front End Engineering Design) | 2013 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | INSTALLATION OF NEW ULTRA LOW NOX BURNERS ON FIRED HEATERS, GELA REFINERY | BASIC AND DETAILED ENGINEERING | 2013 | RAFFINERIA DI GELA | ITALY | COMPLETED |
DOWNSTREAM/ FERTILIZERS | DANGOTE AMMONIA/UREA COMPLEX | DETAILED ENGINEERING | 2013 | SAIPEM | NIGERIA | COMPLETED |
DOWNSTREAM/ PETRO-CHEMICALS | NEW FLARE GAS RECOVERY UNIT, SARROCH PETROCHEMICAL COMPLEX | BASIC ENGINEERING | 2013 | VERSALIS | SARROCH (CA), ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | INTEGRATION OF PV PLANT WITH DIESEL GENERATOR TO PROVIDE ELECTRICITY FOR WELL HEAD PUMPS AT AGIBA OIL FIELD | BASIC ENGINEERING | 2012 | ENIPOWER | EGYPT | COMPLETED |
DOWNSTREAM/ REFINING | NEW HYDROGEN PRODUCTION UNIT BASED ON ENI’S PROPRIETARY SCT-CPO TECHNOLOGY, SANNAZZARO DE’ BURGONDI REFINERY | FEED (Front End Engineering Design) & DETAILED ENGINEERING | 2012 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | NEW TREATED DISTILLATE AROMATIC EXTRACT (TDAE) PLANT, LIVORNO REFINERY | FEASIBILITY STUDY | 2012 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | EXISTING TANK FARM FOR STORAGE OF RAW VEGETABLE OILS AND BIODIESEL AND FRONT END ENGINEERING DESIGN OF THE RELEVANT REVAMPING - GREEN REFINERY PROJECT, VENICE REFINERY | TECHNICAL ASSESMENT | 2012 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
DOWNSTREAM/ PETRO-CHEMICALS | BLOW DOWN SYSTEMS AFTER THE INSTALLATION OF NEW PROCESS UNITS, SARROCH PETROCHEMICAL COMPLEX | PROCESS STUDY | 2012 | VERSALIS | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ PETRO-CHEMICALS | NEW COMMERCIAL DEMONSTRATION PLANT FOR THE PRODUCTION OF TACKIFYING RESINS | BASIC ENGINEERING | 2012 | VERSALIS | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | NORTH WEST RED WATER LC FINER RESIDUES CONVERSION UNIT | FEED (Front End Engineering Design) | 2012 | SAIPEM | CANADA | COMPLETED |
DOWNSTREAM/ REFINING | NEW VACUUM COLUMN AND FILTRATION SYSTEM OF FCC CLARIFIED OIL, SANNAZZARO DE’ BURGUNDI REFINERY | ENGINEERING, PROCUREMENT & COSTRUCTION (EPC/LSTK Contract) | 2011 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
DOWNSTREAM/ CHEMICALS | PROPRIETARY SPECIALTY CHEMICAL PRODUCTION UNIT (XD23) | FEED (Front End Engineering Design) & BASIC ENGINEERING | 2011 | ENI S.p.A. Div. REFINING & MARKETING | ROBASSOMERO, ITALY | COMPLETED |
DOWNSTREAM/ REFINING | NEW WATER REUSE UNIT BASED ON ULTRA-FILTRATION AND REVERSE OSMOSIS TECHNOLOGIES, SANNAZZARO DE BURGUNDI REFINERY | DETAILED ENGINEERING AND PROCUREMENT SERVICES | 2011 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | NEW 10,000 NM3/H CARBON DIOXIDE REMOVAL UNIT | DETAILED ENGINEERING, PROCUREMENT SERVICES & HOME OFFICE SERVICES | 2011 | DANIELI Far East | FAR EAST | COMPLETED |
POWER | INSTALLATION OF A NEW STEAM BOILER (160 MWT) AT RAVENNA POWER PLANT | BASIC ENGINEERING & COST ESTIMATE | 2011 | ENIPOWER | ITALY | COMPLETED |
POWER | INSTALLATION OF N.2 NEW HP STEAM BOILERS (2 X 150 T/H), PORTO MARGHERA PETROCHEMICAL COMPLEX | BASIC ENGINEERING & COST ESTIMATE | 2011 | POLIMERI EUROPA | ITALY | COMPLETED |
UPSTREAM/GAS/ OFFSHORE | EPC FOR FAUZIA, ELETTRA AND BENEDETTA PLATFORMS | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2010 | ENI S.p.A. Div. REFINING & MARKETING | ADRIATIC SEA, ITALY | COMPLETED |
MIDSTREAM/ PIPELINES | METHANOL STORAGE AND INJECTION UNIT FOR INHIBITION OF HYDRATE FORMATION IN THE TRANS MEDITERRANEAN PIPELINE, CAP BON TERMINAL | FEASIBILITY STUDY, BASIC DESIGN AND RISK ANALYSIS | 2010 | TMPC | TUNISIA | COMPLETED |
MIDSTREAM/ GAS/OFFSHORE | WOBBE INDEX CORRECTION SYSTEMS AT ADRIATIC LNG TERMINAL | FEASIBILITY STUDY & BASIC ENGINEERING | 2010 | URS/Adriatic LNG | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | CHLORIDE REMOVAL UNIT UPSTREAM OF THE CONTINUOUS CATALYTIC REFORMING UNIT (CCR), CREMONA REFINERY | DETAILED ENGINEERING | 2010 | TAMOIL | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | NEW 1 KM X 4” SKIN-EFFECT ELECTRICALLY TRACED LIQUID SULPHUR TRANSFER LINE AND REVAMPING OF ASSOCIATED UNITS, TARANTO REFINERY | ENGINEERING, PROCUREMENT & COSTRUCTION (EPC Contract) | 2010 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
UPSTREAM/OIL | NEW UTILITY WATER SYSTEMS AT NC-115 GOSP "A", GOSP "B" & CCX INDUSTRIAL AREA AND NC-186 GOSP "A”, – FINAL CLIENT: AKAKUS OIL | MULTIDISCIPLINARY ENGINEERING | 2010 | BONATTI S.p.A. | LIBYA | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | PHOTOVOLTAIC PLANT (2 MW) | BASIC DESIGN | 2010 | ENIPOWER | MELLITAH, LIBYA | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | PHOTOVOLTAIC PLANT (1 MW) | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2010 | ENIPOWER | TARANTO, ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | PHOTOVOLTAIC PLANTS ON SCHOOL ROOFTOPS (1 MW) | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2010 | ENIPOWER | ROMA, ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | PHOTOVOLTAIC PLANT (4 MW) | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2010 | ENIPOWER | FERRANDINA, ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | PHOTOVOLTAIC PLANT (3,4 MW) | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2010 | ENIPOWER | PISA, ITALY | COMPLETED |
EPC FOR THE REVAMPING OF BOLGIANO COMBINED HEAT & POWER PLANT (140 MWTH), S. DONATO MILANESE | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2009 | ENIPOWER | ITALY | COMPLETED | |
NEW UTILITY WATER SYSTEMS AT NC-115 GOSP "A", GOSP "B" & CCX INDUSTRIAL AREA AND NC-186 GOSP "A”, – FINAL CLIENT: AKAKUS OIL | MULTIDISCIPLINARY ENGINEERING | 2009 | BONATTI S.p.A. | ITALY | COMPLETED | |
N.2 PHOTOVOLTAIC PLANTS AT TARANTO (1 MWE) AND FERRANDINA (4 MWE) | FEED (Front End Engineering Design) | 2009 | ENIPOWER | ITALY | COMPLETED | |
DOWNSTREAM/ REFINING | EST (ENI SLURRY TECHNOLOGY) PLANT AT SANNAZZARO REFINERY - FINAL CLIENT: ENI R&M DIV | MULTIDISCIPLINARY ENGINEERING | 2009 | SAIPEM | ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | NR. 2 BIOMASS FIRED POWER PLANTS (14 MW AND 10 MW) | CONCEPTUAL DESIGN & COST ESTIMATE | 2009 | SIRAM S.p.A. | ITALY | COMPLETED |
UPSTREAM/OIL | GAS OIL SEPARATION PLANT, BURUN OIL FIELD - FINAL CLIENT: ENI E&P DIV. | DESIGN REVIEW & BASIC ENGINEERING | 2009 | SAIPEM ENERGY SERVICES | TURKMENISTAN | COMPLETED |
DOWNSTREAM/ FERTILIZERS | AMMONIA & UREA PLANTS, QAFCO 5 PROJECT, MESAIEED - FINAL CLIENT: QATAR FERTILIZERS CO. | MULTIDISCIPLINARY ENGINEERING | 2008 | SNAMPROGETTI | QATAR | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | BIOMASS FIRED POWER PLANT, OLEVANO LOMELLINA | BASIC ENGINEERING | 2008 | TECNIMONT | ITALY | COMPLETED |
UPSTREAM/OIL/ OFFSHORE | OUT OF SERVICE OF GAS SWEETENING UNIT DP4 OFFSHORE PLATFORM, BOURI FIELD | RISK ANALYSIS & ASSESSMENT STUDY | 2008 | ENI Oil Co. Ltd | LYBIA | COMPLETED |
UPSTREAM/OIL | WATER INJECTION SYSTEM UPGRADING AT NC-115 EL SHARARA GOSP “B” - FINAL CLIENT: AKAKUS OIL | DETAILED DESIGN | 2008 | BONATTI S.p.A. | LYBIA | COMPLETED |
DOWNSTREAM/ REFINING | C4 BUTYLENIC STREAM DRYER PACKAGE, SANNAZZARO DE’ BURGONDI REFINERY | ENGINEERING, PROCUREMENT & COSTRUCTION (EPC Contract) | 2008 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | PIER 2 / MOORING 06 BIS: MARINE LOADING ARMS REVAMPING AND REPLACEMENT, MILAZZO REFINERY IN PARTNERSHIP WITH I.F.A. SRL AND FMC TECHNOLOGIES | ENGINEERING, PROCUREMENT & COSTRUCTION (EPC\LSTK Contract) | 2007 | RAFFINERIA DI MILAZZO S.C.p.A. | ITALY | COMPLETED |
UPSTREAM/OIL/ OFFSHORE | REVAMPING AND MODIFICATIONS OF KITINA PLATFORM TOP SIDE FACILITIES - FINAL CLIENT: ENI E&P DIV. | PROCESS ENGINEERING | 2007 | SAIPEM ENERGY INT. | CONGO | COMPLETED |
POWER | 12 T POWER BOILERS SUBSTITUTION WITH 3.5 MW POWER BOILERS/ SOLAR CENTAURO 55 TURBOGAS AT ROBASSOMERO PLANT - FINAL CLIENT: ENI R&M DIV. | DETAILED DESIGN | 2007 | CO.ME.CF s.r.l. | ITALY | COMPLETED |
DOWNSTREAM/ PETROCHEMICALS | WASTE WATER TREATMENT PLANT (TAS) COVERING SYSTEM AND VAPOUR RECOVERY CRYOGENIC CONDENSATION UNIT SYSTEM, SARROCH PETROCHEMICAL COMPLEX | ENGINEERING, PROCUREMENT & COSTRUCTION (EPC\LSTK Contract) | 2007 | POLIMERI EUROPA | SARROCH (CA), ITALY | COMPLETED |
DOWNSTREAM/ FERTILIZERS | AMMONIA & UREA UNITS, ENGRO PROJECT - FINAL CLIENT: ENGRO CHEMICALS CO. | MULTIDISCIPLINARY ENGINEERING | 2007 | SNAMPROGETTI | PAKISTAN | COMPLETED |
POWER | BOCAMINA II 370 MWE COAL FIRED POWER PLANT, PUERTO CORONEL - FINAL CLIENT: ENDESA | BASIC ENGINEERING & DETAILED ENGINEERING | 2007 | TECNIMONT | CHILE | COMPLETED |
DOWNSTREAM/ REFINING | TARANTO PLUS REFINERY EXPANSION PROJECT (TOPPING/VACUUM; LPG TREATMENT PACKAGE; AUXILIARY; INTERCONNECTING, GASOIL HDS) - FINAL CLIENT: ENI R&M DIV. | MULTIDISCIPLINARY ENGINEERING | 2006 | SNAMPROGETTI | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | NEW SOUR WATER STRIPPER AT LIVORNO REFINERY | PROCESS ENGINEERING | 2006 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
POWER | REPLACEMENT OF STEAM GENERATORS AT EXISTING POWER PLANT | FEASIBILITY STUDY | 2006 | ENI S.p.A. Div. REFINING & MARKETING | ROBASSOMERO, ITALY | COMPLETED |
POWER | EPC FOR THE EXPANSION OF NAOC ELECTRICAL POWER PLANT | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2006 | ENI S.p.A. Div. EXPLORATION & PRODUCTION | OKPAI, NIGERIA | COMPLETED |
DOWNSTREAM/ REFINING | ISOCRACKER PLANT AND ASSOCIATED UNITS, SANNAZZARO DE’ BURGONDI REFINERY – FINAL CLIENT: ENI R&M DIV. | MACHINERY ENGINEERING AND PACKAGES TECHNICAL FOLLOW-UP | 2006 | SNAMPROGETTI | ITALY | COMPLETED |
DOWNSTREAM/ PETRO-CHEMICALS | NKNK LLDPE / HDPE PROJECT | MULTIDISCIPLINARY ENGINEERING | 2006 | TECNIMONT | NIZHNEKAMSK, RUSSIA | COMPLETED |
UPSTREAM/OIL/ OFFSHORE | LITCHENDJLI AND BANGA PLATFORMS - FINAL CLIENT: ENI E&P DIV. | PROCESS ENGINEERING DESIGN & FIREFIGHTING STUDY | 2006 | SAIPEM ENERGY INT. | CONGO | COMPLETED |
UPSTREAM/OIL | H2S REMOVAL, KALAMAKAS PROJECT - FINAL CLIENT: ENI E&P DIV. | PROCESS ENGINEERING | 2006 | SAIPEM ENERGY INT. | CASPIAN SEA, KAZAHSTAN | COMPLETED |
DOWNSTREAM/ REFINING | NEW GPL DESULPHURIZATION UNIT, VENEZIA REFINERY | FEED (Front End Engineering Design) | 2006 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
DOWNSTREAM/ PETRO-CHEMICALS | UTILITIES & OFFSITES, ILAM PETROCHEMICAL COMPLEX | BASIC ENGINEERING & DETAILED ENGINEERING | 2006 | NORAHAN SANAYE | IRAN | COMPLETED |
MIDSTREAM/ OIL TERMINAL/ PIPELINE | TRANS ANATOLIAN PIPELINE (TAP) INCLUDING SAMSUN MARINE TERMINAL (BLACK SEA), CEYHAN MARINE TERMINAL (MEDITERRANEAN SEA) , NPS 48” OIL PIPELINE, TRANS ANATOLIAN PIPELIN - FINAL CLIENT: ENI E&P. DIV. | CONCEPTUAL DESIGN &FEED | 2006 | SNAMPROGETTI | TURKEY | COMPLETED |
DOWNSTREAM/ REFINING | PIER 2 – N. 4X16” MARINE LOADING ARMS DISMANTLING AND REPLACED WITH N. 3X16” LOADING ARMS - PERFORMED IN PARTNERSHIP WITH IFA SRL & FMC TECHNOLOGIES | TURN KEY JOB | 2005 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO (ME), ITALY | COMPLETED |
UPSTREAM/OIL | COMMERCIAL DEMONSTRATION PLANT FOR H2S REMOVAL - FINAL CLIENT: ENI E&P DIV. | FEED (Front End Engineering Design) | 2005 | ENGINEERING & MANAGEMENT SERVICES | KARACHAGANAK, KAZAKHSTAN | COMPLETED |
UPSTREAM/OIL/ OFFSHORE | LITCHENDJLI AND BANGA PLATFORM - FINAL CLIENT: ENI E&P DIV. | FIRE-FIGHTING STUDY | 2005 | TECNOMARE | CONGO | COMPLETED |
DOWNSTREAM/ REFINING | VAPOUR RECOVERY UNIT (VRU) AT JETTY # 2 | FEASIBILITY STUDY & BASIC ENGINEERING | 2005 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO (ME), ITALY | COMPLETED |
UPSTREAM/OIL/ OFFSHORE | AWA/PALOUKOU PLATFORM - FINAL CLIENT: ENI E&P. DIV. | PROCESS ENGINEERING DESIGN | 2005 | SAIPEM ENERGY INT. | CONGO | COMPLETED |
UPSTREAM/OIL | EPC FOR THE WATER INJECTION SYSTEM & POWER GENERATION SYSTEM, ELEPHANT OIL FIELD | FEASIBILITY STUDY, FEED & PREPARATION OF TENDER DOCUMENTS | 2005 | ENI Oil Co. Ltd | LYBIA | COMPLETED |
DOWNSTREAM/ REFINING | SAMIR UP-GRADE PROJECT - MOHAMMEDIA (MOROCCO). CCR PLATFORMER & LRSN ISOMERIZATION PLANT – YANBU (SAUDI ARABIA) RAS LAFFAN LPG – PHASE 2 FEED – RAS LAFFAN (QATAR) NGL – RUWAIS (UAE) | ENGINEERING | 2005 | SNAMPROGETTI | VARIOUS (MORROCO, SAUDI ARABIA, QATAR, UAE, | COMPLETED |
DOWNSTREAM/ REFINING | ISOCRACKER PLANT AND AUXILIARY UNITS – SANNAZZARO REFINERY – FINAL CLIENT: ENI R&M DIV. | MULTIDISCIPLINARY ENGINEERING | 2005 | SNAMPROGETTI | ITALY | COMPLETED |
MIDSTREAM/ PIPELINES | EPC FOR NEW 18” GAS PIPELINE KWALE | PREPARATION OF TENDER DOCUMENTS | 2005 | ENI S.p.A. Div. EXPLORATION & PRODUCTION/NAOC | OKPAI, NIGERIA | COMPLETED |
UPSTREAM/OIL | NEW OIL WELLS 13 & 19 | MULTIDISCIPLINARY ENGINEERING | 2005 | ENI S.p.A. Div. EXPLORATION & PRODUCTION/NAOC | PISTICCI, ITALY | COMPLETED |
UPSTREAM/GAS | GAS COMPRESSION PLANTS AT CORTEMAGGIORE, SETTALA, CINISELLO BALSAMO, RIPALTA, SERGNANO, MINERBIO | MULTIDISCIPLINARY ENGINEERING | 2005 | STOGIT | ITALY | COMPLETED |
POWER | SUPPLY AND INSTALLATION OF A 3MW POWER PLANT FOR LOCAL COMMUNITY | FRONT END ENGINEERING DESIGN (FEED) AND PREPARATION OF TENDER DOCUMENTS | 2004 | ENI S.p.A. Div. EXPLORATION & PRODUCTION | OKPAI, NIGERIA | COMPLETED |
DOWNSTREAM/ REFINING | REVAMPING THE INSTRUMENTATION AND CONTROL SYSTEM OF THE WASTE WATER TREATMENT PLANT, GELA REFINERY | ENGINEERING, PROCUREMENT & COSTRUCTION (EPC\LSTK Contract) | 2004 | RAFFINERIA DI GELA | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | LPG RAILWAY LOADING STATION | BASIC ENGINEERING | 2004 | FMC Energy System | NOYABRSK, RUSSIA | COMPLETED |
DOWNSTREAM/ REFINING | ENERGY SAVING ON TOPPING 1 AND VACUUM PLANT, SANNAZZARO DE’ BURGONDI REFINERY | BASIC ENGINEERING | 2004 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
MIDSTREAM/ PIPELINES | EPC FOR 18” OIL PIPELINE TEBIDABA | PREPARATION OF TENDER DOCUMENTS | 2004 | ENI S.p.A. Div. EXPLORATION & PRODUCTION/NAOC | BRASS, NIGERIA | COMPLETED |
MIDSTREAM/ PIPELINES | 24” GAS PIPELINE OGBAINBIRI – OB/OB | FOLLOW-UP AND CHECK OF THE TECHNICAL DOCUMENTS ISSUED FOR CONSTRUCTION BY THE EPC CONTRACTOR | 2004 | ENI S.p.A. Div. EXPLORATION & PRODUCTION/NAOC | NIGERIA | COMPLETED |
MIDSTREAM/ MARINE OIL TERMINAL | PIER MODIFICATIONS TO ALLOW THE MOORING OF SHIPS WITH 65.000 / 70.000 TON DGW, PANIGAGLIA LNG REGASSIFICATION TERMINAL - FINAL CLIENT: SNAM | STUDY | 2004 | ITALPROGETTI | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | FCC GASOLINE HDS PLANT AT SANNAZZARO DE’ BURGONDI REFINERY - FINAL CLIENT: ENI R&M DIV. | DETAILED DESIGN | 2003 | SNAMPROGETTI SUD | ITALY | COMPLETED |
MIDSTREAM/ OIL TERMINAL | N. 8 ENI PETROLEUM PRODUCTS TERMINAL | FEASIBILITY STUDY & COST ESTIMATE | 2003 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
MIDSTREAM/ OIL TERMINAL | NEW MARINE TERMINAL IN GAETA | FEASIBILITY STUDY & COST ESTIMATE | 2003 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
MIDSTREAM/ OIL TERMINAL | ENI MARINE PETROLEUM PRODUCTS TERMINAL IN VIBO VALENTIA | BASIC ENGINEERING | 2003 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
MIDSTREAM/ PIPELINES | GRAN SAN BERNARDO SERVICE TUNNEL RELOCATION | DETAILED DESIGN | 2003 | PRAOIL | ITALY | COMPLETED |
MIDSTREAM/ PIPELINES | GENUA DEBOTTLENECKING PROJECT | DETAILED DESIGN | 2003 | PRAOIL | ITALY | COMPLETED |
MIDSTREAM/ OIL TERMINAL | RATIONALIZATION OF PETROLEUM PRODUCTS DISPATCH AT GENUA HARBOUR | FEASIBILITY STUDY | 2003 | GENUA PORT AUTHORITY | ITALY | COMPLETED |
POWER | 3D MODELLING FOR THE OKPAI POWER PLANT | ELECTRO-INSTRUMENTAL ENGINEERING | 2003 | ALSTOM POWER BOILERS | NIGERIA | COMPLETED |
DOWNSTREAM/ REFINING | WAX VACUUM PLANT REVAMPING PROJECT AT LIVORNO REFINERY | BASIC ENGINEERING & COST ESTIMATE | 2002 | Agip Petroli | ITALY | COMPLETED |
DOWNSTREAM/ CHEMICAL | THIRD METHANOL PLANT, BANDAR IMAM | DETAILED DESIGN | 2002 | SNAMPROGETTI | ITALY | COMPLETED |
UPSTREAM/OIL | INSTALLATION OF A NEW REGENERATION GAS COMPRESSOR INSTALLATION, NGL RECOVERY PLANT | FEASIBILITY STUDY | 2002 | Agip Oil Co.Ltd | LYBIA | COMPLETED |
DOWNSTREAM/ REFINING | TOPPING 2 (UNIT 10) REVAMPING AT SANNAZZARO DE’ BURGONDI REFINERY - FINAL CLIENT: AGIP PETROLI | ENGINEERING, PROCUREMENT & COSTRUCTION (EPC Contract) | 2002 | SNAMPROGETTI | ITALY | COMPLETED |
MIDSTREAM/ OIL TERMINAL | AGIP AND IPLOM PRODUCTS DISTRIBUTION IN GENUA | RATIONALIZATION DESIGN STUDY | 2000-2001 | PRAOIL | ITALY | COMPLETED |
DOWNSTREAM/ REFINING | NEW LUBE OIL RE-REFINING (HYDRO-FINISHING) PLANT AND OFF-SITES REVAMPING AT PIEVE FISSIRAGA REFINERY | FEASIBILITY STUDY, FEED, DETAIL ENGINEERING, COST ESTIMATE, PROCUREMENT, INSPECTION AND EXPEDITING OF MATERIALS | 2000-2001 | VISCOLUBE | ITALY | COMPLETED |
UPSTREAM/ OIL | GAS LIFT PROJECT INCLUDING GAS LIFT COMPRESSION, METHANOL & CHEMICAL INHIBITOR INJECTION SKIDS, TRUNK LINES AND FLOWLINES, RAGUBA, | ENGINEERING | 2000-2001 | SIRTE OIL COMPANY | LYBIA | COMPLETED |
POWER | COMBINED HEAT & POWER PLANT – FINAL CLIENT: HICKSON & WELCH LTD | MULTIDISCIPLINARY ENGINEERING | 2000-2001 | ENELPOWER | CASTLEFORD, UNITED KINGDOM | COMPLETED |