PROJECT CATEGORYPROJECT DESCRIPTIONSCOPE
OF WORK
YEARCLIENTLOCATIONSTATUS
DOWNSTREAM/
PETRO-
CHEMICALS
UTILITIES AND OFFSITES OF A NEW 500,000 MTPY HDPE PLANTFEED (Front End Engineering Design)2021SAIPEMCHINAIN PROGRESS
DOWNSTREAM/
REFINING
NEW REFINERY CONFIGURATION AFTER SEPARATION OF FUELS AND LUBE PLANTSFEED (Front End Engineering Design)2021ENI S.p.a.LIVORNO REFINERY (ITALY)IN PROGRESS
DOWNSTREAM/
CHEMICAL
NEW PHOSPHORIC ACID SCRUBBING SYSTEMDETAIL DESIGN2021ITELYUM PURIFICATIONLANDRIANO (ITALY)IN PROGRESS
DOWNSTREAM/
REFINING
REVAMPING OF EXISTING GASOIL HYDRODESULPHURIZATION UNIT (U-400)CONSTRUCTABILITY STUDY2021ISAB/LUKOILPRIOLO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
ASSESSMENT OF THE IMPACT OF THE NEW STEAM REFORMER UNIT ON THE EXISTING BD SYSTEMPROCESS STUDY2021ENI S.p.a.VENICE REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
NEW REFINERY CONFIGURATION FOR SEPARATION OF FUELS AND LUBE PRODUCTIONFEED (Front End Engineering Design)2021ENI S.p.a.LIVORNO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
TECHNICAL GASES
NEW PLANT FOR PRODUCTION OF HIGH PURITY NITROGENPROJECT MANAGEMENT SERVICES2021SAPIOITALYCOMPLETED
DOWNSTREAM/
REFINING
GOFINATE PLANT - NEW ENERGY INTEGRATION PROJECT BASIC DESIGN2020ISAB/LUKOILPRIOLO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
UPDATE OF BASIC DESIGN FOR REVAMPING OF THE EXISTING WASTE WATER TREATMENT PLANT BASIC DESIGN2020ISAB/LUKOILPRIOLO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
BALANCE OF PLANT OF THE NEW ELECTROSTATIC FILTER FOR FCC CLARIFIED OIL (CLO)BASIC DESIGN2020ISAB/LUKOILPRIOLO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
DEBOTTLENECKING OF EXISTING LP FUEL GAS NETWORK AND NEW MP FUEL GAS PIPELINE (6" X 1 KM) TO THE NEARBY POWER STATION TO FEED THE FG TO THE GAS TURBINESDETAIL ENGINEERING2020ENI AngolaLUANDA REFINERY (ANGOLA)IN PROGRESS
DOWNSTREAM/
REFINING
DETAIL ENGINEERING FOR REPLACEMENT OF LEGACY BURNERS OF HEATER F3101 WITH NEW ULTRA LOW-NOX BURNERSDETAIL ENGINEERING2020SARPOMSARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
MULTIDISCIPLINARY SUPERVISION SERVICES DURING MAJOR TURNAROUND OF THE FOLLOWING REFINERY UNITS: TOPPING 1, FCC, ALKYLATION, SOUR WATER STRIPPER, BLOW DOWNSUPERVISION SERVICES2020SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
CHEMICAL
TECHNOLOGY COMPARISON AND LICENSOR SELECTION FOR THE NEW 750,000 MTPY METHANOL PLANTTECHNICAL ADVISORY SERVICES 2020ORLEN POLUDNIEJEDLICZE (POLAND)COMPLETED
DOWNSTREAM/
REFINING
ASSESSMENT OF THE EXISTING REFINERY FUEL GAS SYSTEM IN ORDER TO HANDLE THE ADDITIONAL FUEL GAS PRODUCED IN THE NEW PLATFORMING UNITPROCESS STUDY2020ENI AngolaLUANDA REFINERY (ANGOLA)COMPLETED
DOWNSTREAM/
REFINING
REPLACEMENT OF LEGACY BURNERS WITH NEW ULTRA LOW NOX BURNERS ON N.5 PROCESS HEATERSDETAIL ENGINEERING2020ENI AngolaLUANDA REFINERY (ANGOLA)COMPLETED
DOWNSTREAM/
REFINING
ASSESSMENT BY FEM ANALYSIS OF STRUCTURAL STABILIT OF 42" CRUDE OIL SEALINE BETWEEN ISOLA DEI PETROLI AND SAN LEONARDOASSETT INTEGRITY STUDY2020ENI S.p.A.VENICE REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
ASSESSMENT OF OPERATING CONDITIONS OF CRUDE DISTILLATION UNIT HEATER(F2) WITH NEW FEEDSTOCK IN ORDER TO INSURE COMPLIANCE WITH DESIGN CONDITIONS AND ACTUAL MECHANICAL CONDITIONS OF THE EQUIPMENTASSETT INTEGRITY STUDY2020ENI S.p.A.LIVORNO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
ALKYLATION UNIT: REPLACEMENT OF UPPER SECTION AND OVERHEAD REFLUX DRUM OF DEPROPANIZER COLUMN; REPLACEMENT OF HF REDITILLATION COLUMN; REPLACEMENT OF INTERFERING PIPING LINESBASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION SERVICES2019SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
SOUR WATER STRIPPER UNIT: IMPLEMENTATION OF IMPROVEMENTSDETAIL ENGINEERING AND SUPERVISIONE SERVICES 2019SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
ALBERTINE GRABEN REFINERY PROJECT: UTILITIES AND OFFSITES SYSTEMS, I.E. TANK FARM, FUEL GAS, WASTE WATER TREATMENT PLANT, FLARE BASIC DESIGN2019SAIPEMHOMA (UGANDA)COMPLETED
DOWNSTREAM/
REFINING
ALBERTINE GRAVEL REFINERY PROJECT: DIESEL HYDROTREATING (UNIT 11) AND RFCC GASOLINE HYDROTREATING (UNIT 13)FEED (Front End Engineering Design)2019SAIPEMHOMA (UGANDA)COMPLETED
DOWNSTREAM/
REFINING
THAI OIL REFINERY PROJECT: MULTIDISCIPLINARY ENGINEERING SERVICES FOR SEVERAL REFINERY UNITSDETAIL ENGINEERING2019SAIPEMSRIRACHA (THAILAND)COMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF DESALTER T4 BY INSTALLATION OF MUD WASHING SYSTEMBASIC DESIGN2019RAFFINERIA DI MILAZZO S.C.p.A.MILAZZO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
CHEMICAL
MECHANICAL DESIGN FOR CONSTRUCTION OF N.8 DISTILLATION COLUMN AND N. 32 S&T HEAT EXCHANGERS FOR PAN PRECURSOR PLANTDETAIL ENGINEERING 2019MAEITALY/RUSSIACOMPLETED
DOWNSTREAM/
REFINING
OFF-GAS RECOVERY AND REUSE AT VACUUM DISTILLATION UNIT (UN-600) TO PREVENT H2S EMISSIONS IN THE ATMOSPHERE. THE RECOVERED OFF-GAS IS BURNT INTO THE VDU FIRED-HEATER H-601. FEASIBILITY STUDY + BASIC DESIGN2019ENI Angola / Sonangol EPLUANDA REFINERY (ANGOLA)COMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF BITUMEN LOADING BAYSBASIC DESIGN2019ENI S.p.A.VENICE REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF FIRED-HEATERS AT HOT OIL UNIT AND CRUDE DISTILLATION UNITFEASIBILITY STUDY + BASIC DESIGN2019ENI S.p.A.TARANTO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
BYPASS OF TOWER C1401 AT VISBREAKING UNIT.FEASIBILITY STUDY 2019ENI S.p.A.TARANTO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
ROOT CAUSE ANALYSIS OF CORROSION ISSUES IN THE CRUDE DISTILLATION UNIT OVERHEAD CIRCUITASSETT INTEGRITY STUDY2019ENI S.p.A.LIVORNO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
ROOT CAUSE ANALYSIS OF CORROSION ISSUES IN THE SOUR WATER STRIPPER COLUMN BOTTOM SECTIONASSETT INTEGRITY STUDY2019ENI S.p.A.LIVORNO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
IMPROVEMENT OF THE HOT REFLUX SYSTEM AT THE EXISTING VACUUM DISTILLATION UNIT (VACUUM 1)BASIC DESIGN2019ENI S.p.A.SANNAZZARO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
OPTIMIZATION OF LVGO RECOVERY FROM FCC CLARIFIED OIL (CLO)PROCESS STUDY2019ENI S.p.A.SANNAZZARO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
LAYOUT MODIFICATION OF WEMCO FLOTATION UNIT AT WASTE WATER TREATMENT PLANT (TAS)BASIC DESIGN2019ENI S.p.A.TARANTO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
NEW VAPOUR RECOVEY SYSTEM FOR SHIPS LOADINGBASIC DESIGN2019ENI S.p.A.TARANTO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
VAPOUR RECOVERY UNITS INTERCONNECTING SYSTEM BASIC DESIGN2019ENI S.p.A.TARANTO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
SCRUBBING SYSTEM FOR BITUMEN VAPOURS RELEASED DURING VESSELS LOADING BASIC DESIGN2019ENI S.p.A.TARANTO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
NEW MULTISTAGE DESALTERBASIC DESIGN2019ENI S.p.A.TARANTO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
IMPROVEMENTS AT DEOLING SECTION OF THE WASTE WATER TREATMENT PLANTBASIC DESIGN2019ENI S.p.A.LIVORNO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
SUBSEA HYDROGEN PIPELINE DN" 6 BY GUIDE HORIZONTAL DRILLING, FROM PORTO MARGHERA PETROCHEMICAL COMPLEX TO VENICE REFINERYFEASIBILITY STUDY, FEED2019ENI S.p.A.VENICE REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
INSTALLATION OF 4TH STAGE CICLONES AND NEW HOT CATALYST DISCHARGE SYSTEM AT FCC PLANTFEASIBILITY STUDY, FEED, DETAIL ENGINEERING AND SUPERVISION SERVICES2018-2020SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
NEW CRUDE OIL TRANSFER LINES FROM REFINERY JETTY TO CRUDE OIL TANK FARM, TRV DISCHARGE SYSTEM AND REFURBISHMENT OF CRUDE OIL TANKS AND CRUDE OIL PUMPING STATION BASIC, DETAIL DESIGN, SUPERVISION SERVICES 2018SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
REPLACEMENT OF N.2. TWIN LOBE TYPE AIR COMPRESSORS WITH N.2 NEW SCREW COMPRESSORS EQUIPPED WITH VFD BASIC, DETAIL DESIGN, SUPERVISION SERVICES 2018SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
NEW AMINE WASH TOWER (T-1)BASIC, DETAIL DESIGN, SUPERVISION SERVICES 2018SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
REFURBISHING OF LV DISTRIBUTION OF ELECTRICAL HEATING SYSTEMS ON CRUDE AND PRODCUTS PIPELINES AT REFINERY JETTYDETAIL DESIGN2018SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
REPLACEMENT OF N. 4 REACTORS AND FLUE GAS DUCTS OF PROCESS HEATERS AT CATALYTIC REFORMING PLANTFEED, DETAIL ENGINEERING AND EQUIPMENT INSPECTION AND TESTING, SUPERVISION SERVICES2018SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
NEW HYDROGEN RECOVERY UNIT (PSA2) FROM REFINERY OFF-GASFEED, PREPARATION OF TENDER DOCUMENTS FOR EPC2018RAFFINERIA DI MILAZZO S.C.p.A.MILAZZO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
GREEN MONOMERS PRODUCTION PLANT. DEBOTTLENECKING OF N.2 PROCESS UNITS (U-2100, U-2200).BASIC DESIGN, DETAIL DESIGN, CONSTRUCTION SUPERVISION 2018PKN ORLENPLOCK REFINERY (POLAND)COMPLETED
DOWNSTREAM/
REFINING
EFFICIENCY IMPROVEMENT AND EMISSIONS REDUCTION OF N.8 PROCESS HEATERSFEASIBILITY STUDY2018ENI AngolaLUANDA REFINERY (ANGOLA)COMPLETED
DOWNSTREAM/
REFINING
RECOVERY SYSTEM OF COOLING WATER STREAMS LOST TO DRAINFEASIBILITY STUDY + BASIC DESIGN + DETAIL DESIGN2018ENI AngolaLUANDA REFINERY (ANGOLA)COMPLETED
DOWNSTREAM/
REFINING
ASSESSMENT AND DEBOTTLENECKING OF CRUDE DISTILLATION UNIT UN-150 AND RECOVERY UNIT UN-550, IN ORDER TO PROCESS THE INCREASED QUANTITY OF GASOLINE AND LPG PRODUCED BY THE NEW PLATFORMING UNITFEASIBILITY STUDY2018ENI AngolaLUANDA REFINERY (ANGOLA)COMPLETED
DOWNSTREAM/
REFINING
DEBOTTLENECKING OF REFINERY COOLING WATER INTAKE SYSTEMFEASIBILITY STUDY2018ENI AngolaLUANDA REFINERY (ANGOLA)COMPLETED
DOWNSTREAM/
REFINING
NEW WATER INJECTION SYSTEM TO PREVENT AMMONIUM SALTS DEPOSITION IN THE EQUIPMENT OF THE GASOLINE DESULPHURIZATION UNITSBASIC DESIGN2018ENI S.p.A.SANNAZZARO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
ASSESSMENT OF OPERATING CONDITIONS FOR TRANSPORT OF JET FUEL OVER THE SANNAZZARO REFINERY TO MALPENSA AIRPORT PIPELINEPROCESS STUDY2018ENI S.p.A.SANNAZZARO-MALPENSA JET FUEL PIPELINE (ITALY)COMPLETED
DOWNSTREAM/
REFINING
NEW GASOLINE STABILIZER COLUMN.FEASIBILITY STUDY2018ENI S.p.A.SANNAZZARO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
PROCESS IMPROVEMENTS ON VISBREAKING OFF-GAS WASHING SYSTEMBASIC DESIGN2017SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
UTILITIES AND OFFSITES FOR FOD PROJECT: TANK FARM, FLARE, ELECTRICAL SUBSTATION, ROADS AND INFRASTRUCTURESFEASIBILTY STUDY, BASIC DESIGN, FEED AND COST ESTIMATE2017RAFFINERIA DI MILAZZO S.C.p.A.MILAZZO (ME), ITALYCOMPLETED
DOWNSTREAM/
REFINING
FOD PROJECT. HYDROGEN PRODUCTION BY GASSIFICATION OF REFINERY RESIDUES.PMC SERVICES2017RAFFINERIA DI MILAZZO S.C.p.A.MILAZZO (ME), ITALYCOMPLETED
DOWNSTREAM/
REFINING
IMPLEMENTATION OF IMPROVEMENTS AT REFINERY JETTIES FOR OPTIMIZATION OF VESSELS LOADING/UNLOADING TIMEBASIC DESIGN2017ENI S.p.A.LIVORNO REFINERY (ITALY)COMPLETED
DOWNSTREAM/
REFINING
UPGRADING OF MERCAPTAN REMOVAL FROM FUEL GAS AT VISBREAKING PLANTBASIC ENGINEERING2017SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
DESIGN FOR THE NEW H2S REMOVAL TOWER, CCR PLANTDETAILED ENGINEERING2017SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
REPLACEMENT OF REFORMING REACTORS AND HEATERS MANIFOLDS, CCR PLANTDETAILED ENGINEERING2017SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
REPLACEMENT OF REFORMING REACTORS AND HEATERS MANIFOLDS, CCR PLANTPROCESS ENGINEERING2017SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
DEBOTTLENECKING OF COOLING WATER NETWORK, SOUTH PLANTSPROCESS ENGINEERING2017SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF THE EXISTING WATER TREATMENT PLANT (TAS)BASIC DESIGN2017ISAB/LUKOILPRIOLO, ITALYCOMPLETED
DOWNSTREAM/
REFINING
FUEL OIL DESTRUCTION (FODS) PROJECT SITE PREPARATION WORKS (TANKS DISMANTLING, FLARE RELOCATION, NEW ELECTRICAL SUBSTATION,….)FEED (Front End Engineering Design)2017RAFFINERIA DI MILAZZO S.C.p.A. MILAZZO (ME), ITALYCOMPLETED
DOWNSTREAM/
FERTILIZERS & CHEMICALS
METAFRAX PROJECT (AMMONIA/UREA/MELAMINE COMPLEX)MULTIDISCIPLINARY ENGINEERING2017CASALE RUSSIACOMPLETED
DOWNSTREAM/
REFINING
FUEL OIL DESTRUCTION (FODS) PROJECTPMC SERVICE
2016RAFFINERIA DI MILAZZO S.C.p.A. MILAZZO (ME), ITALYCOMPLETED
DOWNSTREAM/
REFINING
ENERGY INTEGRATION BETWEEN MILD HYDROCRACKING UNIT (MHC) AND GASOLINE ETHERIFICATION UNIT (TAME)DETAILED DESIGN2016SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
RELOCATION OF EXISTING FLAREFEASIBILITY STUDY & BASIC ENGINEERING2016RAFFINERIA DI MILAZZO S.C.p.A. MILAZZO (ME), ITALYCOMPLETED
DOWNSTREAM/
REFINING
NEW H2S REMOVAL TOWERFEED (Front End Engineering Design) & BASIC ENGINEERING2016SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
PETROCHEMICALS
HDPE PLANT, P7 AND P27, RAPID PROJECTDETAILED DESIGN2016TECNIMONTMALAYSIACOMPLETED
DOWNSTREAM/
REFINING
UPGRADING AND REVAMPING OF EXISTING BLOW-DOWN AND FLARE SYSTEMBASIC DESIGN2016SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
UPGRADING OF H2S REMOVAL SYSTEM (AMINE SYSTEM)BASIC DESIGN2016SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
REPLACEMENT OF LOADING ARMS AT NORTH PLANTS MARINE TERMINAL DETAILED DESIGN2016SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
NEW 10,000 BPSD NAPHTHA HYDROTREATING UNIT (HDT-3)BASIC DESIGN2015RAFFINERIA DI MILAZZO S.C.p.A.MILAZZO (ME), ITALYCOMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF PROPYLENE RECOVERY, SEPARATION AND STORAGE AT NORTH AND SOUTH PLANTSDETAILED DESIGN2015SARASSARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
UPGRADING OF FIREFIGHTING SYSTEM AT NORTH PLANTS JETTYBASIC DESIGN2015SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF KEROSENE HYDRODESULPHURIZATION UNIT (HDS-1)ENGINEERING, PROCUREMENT & COSTRUCTION (EPC/LSK Contract)2014RAFFINERIA DI MILAZZO S.C.p.A.ITALYCOMPLETED
DOWNSTREAM/
REFINING
200,000 BPSD GREENFIELD REFINERYPREFEASIBILITY STUDY2014PACIFIC FUTURE ENERGY Co.BRITISH COLUMBIA, CANADACOMPLETED
DOWNSTREAM/
REFINING
NEW CONDENSATE DESULPHURIZATION PLANTPREFEASIBILITY STUDY2014UNITED PETROCHEMSOHAR, OMANCOMPLETED
DOWNSTREAM/
REFINING
NEW SCRUBBER FOR FCC FLUE GAS DESULPHURIZATIONFEASIBILITY STUDY2014SARASSARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
THERMAL INTEGRATION BETWEEN MILD HYDROCRACKING (MHC) AND NEW SEA WATER DESALTER (DAMBASIC DESIGN2014SARASSARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
PETROCHEMICALS
CONSTRUCTION OF ETBE/BUTENE-1 PLANT AT RAVENNA PETROCHEMICAL COMPLEXBASIC DESIGN2014VERSALISRAVENNA, ITALYCOMPLETED
DOWNSTREAM/
REFINING
REVAMPING THE RAILROAD UNLOADING FACILITIES AT MANTOVA REFINERYFEASIBILITY STUDY2014IES (MOL Group)ITALYCOMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF FURFURAL PLANT (FT-2) TO TDAE PRODUCTION. LIVORNO REFINERYBASIC AND DETAILED DESIGN2014ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
REFINING
NEW OXYGEN LINE (6’’ X 600 M) FOR OXYGEN ENRICHMENT SYSTEM, FCC PLANDETAILED DESIGN2013SARASSARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF THE LOGISTICS ASSETS, VENICE REFINERYFEED (Front End Engineering Design)2013ENI S.p.A. Div. REFINING & MARKETINGVENICE, ITALYCOMPLETED
DOWNSTREAM/
REFINING
DEBOTTLENECKING OF THE COOLING WATER NETWORK AT SANNAZZARO AND TARANTO REFINERIESBASIC DESIGN2013ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
PETROCHEMICALS
FEED OF ELASTOMER PLANTS (S-SBR, E-SBR, EPDM, SBS), RAPID PROJECTPMC SERVICES
2013VERSALISMALAYSIACOMPLETED
DOWNSTREAM/
FERTILIZERS
AMMONIA PLANT, SPIRITWOOD PROJECTFEED (Front End Engineering Design)2013SAIPEMNORTH DAKOTA, USACOMPLETED
DOWNSTREAM/
REFINING
ENERGY INTEGRATION BETWEEN MILD HYDROCRACKING (MHC) AND GASOLINE ETHERIFICATION UNIT (TAME)FEED (Front End Engineering Design)2013SARASSARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
DEBOTTLENECKING OF TOPPING RT2 UNITBASIC DESIGN& FEED 2013SARASSARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF THE KEROSENE HYDRODESULPHURIZATION UNIT (HDS-1)FEED (Front End Engineering Design)2013RAFFINERIA DI MILAZZO S.C.p.A.ITALYCOMPLETED
DOWNSTREAM/
REFINING
REVAMPING OF THE WASTE WATER TREATMENT PLANT, LIVORNO REFINERY,FEED (Front End Engineering Design)2013ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
REFINING
NEW TREATED DISTILLATE AROMATIC EXTRACT (TDAE) PLANT AT LIVORNO REFINERYFEED (Front End Engineering Design)2013ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
REFINING
INSTALLATION OF NEW ULTRA LOW NOX BURNERS ON FIRED HEATERS, GELA REFINERYBASIC AND DETAILED ENGINEERING2013RAFFINERIA DI GELAITALYCOMPLETED
DOWNSTREAM/
FERTILIZERS
DANGOTE AMMONIA/UREA COMPLEXDETAILED DESIGN2013SAIPEMNIGERIACOMPLETED
DOWNSTREAM/
PETROCHEMICALS
NEW FLARE GAS RECOVERY UNIT, SARROCH PETROCHEMICAL COMPLEXBASIC DESIGN2013VERSALISSARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
REFINING
NEW HYDROGEN PRODUCTION UNIT BASED ON ENI’S PROPRIETARY SCT-CPO TECHNOLOGY, SANNAZZARO DE’ BURGONDI REFINERYFEED (Front End Engineering Design) & DETAILED ENGINEERING2012ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
REFINING
NEW TREATED DISTILLATE AROMATIC EXTRACT (TDAE) PLANT, LIVORNO REFINERYFEASIBILITY STUDY2012ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
PETROCHEMICALS
ASSESSMENT OF BLOW DOWN SYSTEM AFTER THE INSTALLATION OF NEW PROCESS UNITS
PROCESS STUDY2012VERSALISSARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
PETROCHEMICALS
NEW COMMERCIAL DEMONSTRATION PLANT FOR THE PRODUCTION OF TACKIFYING RESINSBASIC DESIGN2012VERSALISITALYCOMPLETED
DOWNSTREAM/
REFINING
NORTH WEST RED WATER LC FINER RESIDUES CONVERSION UNITFEED (Front End Engineering Design)2012SAIPEMCANADACOMPLETED
DOWNSTREAM/
REFINING
NEW VACUUM COLUMN AND FILTRATION SYSTEM OF FCC CLARIFIED OIL, SANNAZZARO DE’ BURGUNDI REFINERYENGINEERING, PROCUREMENT & COSTRUCTION (EPC/LSTK Contract)2011ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
CHEMICALS
NEW PROPRIETARY SPECIALTY CHEMICAL PRODUCTION UNIT (XD23)FEED (Front End Engineering Design) & BASIC DESIGN2011ENI S.p.A. Div. REFINING & MARKETINGROBASSOMERO, ITALY COMPLETED
DOWNSTREAM/
REFINING
NEW WATER REUSE UNIT BASED ON ULTRA-FILTRATION AND REVERSE OSMOSIS TECHNOLOGIES, SANNAZZARO DE BURGUNDI REFINERYDETAILED ENGINEERING AND PROCUREMENT SERVICES2011ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
REFINING
CHLORIDE REMOVAL UNIT UPSTREAM OF THE CONTINUOUS CATALYTIC REFORMING UNIT (CCR), CREMONA REFINERYDETAILED DESIGN2010TAMOILITALYCOMPLETED
DOWNSTREAM/
REFINING
NEW 1 KM X 4” SKIN-EFFECT ELECTRICALLY TRACED LIQUID SULPHUR TRANSFER LINE AND REVAMPING OF ASSOCIATED UNITS, TARANTO REFINERYENGINEERING, PROCUREMENT & COSTRUCTION (EPC Contract)2010ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
REFINING
EST (ENI SLURRY TECHNOLOGY) PLANT AT SANNAZZARO REFINERY - FINAL CLIENT: ENI R&M DIVMULTIDISCIPLINARY ENGINEERING2009SAIPEMITALYCOMPLETED
DOWNSTREAM/
FERTILIZERS
AMMONIA & UREA PLANTS, QAFCO 5 PROJECT, MESAIEED - FINAL CLIENT: QATAR FERTILIZERS CO.MULTIDISCIPLINARY ENGINEERING2008SNAMPROGETTIQATARCOMPLETED
DOWNSTREAM/
REFINING
C4 BUTYLENIC STREAM DRYER PACKAGE, SANNAZZARO DE’ BURGONDI REFINERYENGINEERING, PROCUREMENT & COSTRUCTION (EPC Contract)2008ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
REFINING
PIER 2 / MOORING 06 BIS: MARINE LOADING ARMS REVAMPING AND REPLACEMENT, MILAZZO REFINERY IN PARTNERSHIP WITH I.F.A. SRL AND FMC TECHNOLOGIESENGINEERING, PROCUREMENT & COSTRUCTION (EPC\LSTK Contract)2007RAFFINERIA DI MILAZZO S.C.p.A.ITALYCOMPLETED
DOWNSTREAM/
PETROCHEMICALS
WASTE WATER TREATMENT PLANT (TAS) COVERING SYSTEM AND VAPOUR RECOVERY CRYOGENIC CONDENSATION UNIT SYSTEM, SARROCH PETROCHEMICAL COMPLEXENGINEERING, PROCUREMENT & COSTRUCTION (EPC\LSTK Contract)2007POLIMERI EUROPASARROCH (CA), ITALYCOMPLETED
DOWNSTREAM/
FERTILIZERS
AMMONIA & UREA UNITS, ENGRO PROJECT - FINAL CLIENT: ENGRO CHEMICALS CO.MULTIDISCIPLINARY ENGINEERING2007SNAMPROGETTIPAKISTANCOMPLETED
DOWNSTREAM/
REFINING
TARANTO PLUS REFINERY EXPANSION PROJECT (TOPPING/VACUUM; LPG TREATMENT PACKAGE; AUXILIARY; INTERCONNECTING, GASOIL HDS) - FINAL CLIENT: ENI R&M DIV.DETAIL DESIGN
2006SNAMPROGETTIITALYCOMPLETED
DOWNSTREAM/
REFINING
NEW SOUR WATER STRIPPER AT LIVORNO REFINERYPROCESS ENGINEERING2006ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
REFINING
ISOCRACKER PLANT AND ASSOCIATED UNITS, SANNAZZARO DE’ BURGONDI REFINERY – FINAL CLIENT: ENI R&M DIV.MACHINERY ENGINEERING AND PACKAGES TECHNICAL FOLLOW-UP2006SNAMPROGETTIITALYCOMPLETED
DOWNSTREAM/
PETROCHEMICALS
NKNK LLDPE / HDPE PROJECTMULTIDISCIPLINARY ENGINEERING2006TECNIMONTNIZHNEKAMSK, RUSSIACOMPLETED
DOWNSTREAM/
REFINING
NEW GPL DESULPHURIZATION UNIT, VENEZIA REFINERYFEED (Front End Engineering Design)2006ENI S.p.A. Div. REFINING & MARKETINGITALYCOMPLETED
DOWNSTREAM/
PETROCHEMICALS
UTILITIES & OFFSITES, ILAM PETROCHEMICAL COMPLEXPMC SERVICES
2006NORAHAN SANAYE IRANCOMPLETED
DOWNSTREAM/
REFINING
PIER 2 – N. 4X16” MARINE LOADING ARMS DISMANTLING AND REPLACED WITH N. 3X16” LOADING ARMS - PERFORMED IN PARTNERSHIP WITH IFA SRL & FMC TECHNOLOGIESEPC2005RAFFINERIA DI MILAZZO S.C.p.A. MILAZZO (ME), ITALYCOMPLETED
DOWNSTREAM/
REFINING
VAPOUR RECOVERY UNIT (VRU) AT JETTY # 2FEASIBILITY STUDY & BASIC ENGINEERING2005RAFFINERIA DI MILAZZO S.C.p.A.MILAZZO (ME), ITALYCOMPLETED
DOWNSTREAM/
REFINING
SAMIR UP-GRADE PROJECT - MOHAMMEDIA (MOROCCO).
CCR PLATFORMER & LRSN ISOMERIZATION PLANT – YANBU (SAUDI ARABIA)
RAS LAFFAN LPG – PHASE 2 FEED – RAS LAFFAN (QATAR)
NGL – RUWAIS (UAE)
ENGINEERING2005SNAMPROGETTIMOROCCOCOMPLETED
DOWNSTREAM/
REFINING
ISOCRACKER PLANT AND AUXILIARY UNITS – SANNAZZARO REFINERY – FINAL CLIENT: ENI R&M DIV.MULTIDISCIPLINARY ENGINEERING2005SNAMPROGETTIITALYCOMPLETED
DOWNSTREAM/
REFINING
REVAMPING THE INSTRUMENTATION AND CONTROL SYSTEM OF THE WASTE WATER TREATMENT PLANT, GELA REFINERYENGINEERING, PROCUREMENT & COSTRUCTION (EPC\LSTK Contract)2004RAFFINERIA DI GELAITALYCOMPLETED
DOWNSTREAM/
REFINING
LPG RAILWAY LOADING STATIONBASIC ENGINEERING2004FMC Energy SystemNOYABRSK, RUSSIACOMPLETED
DOWNSTREAM/
REFINING
ENERGY SAVING ON TOPPING 1 AND VACUUM PLANT, SANNAZZARO DE’ BURGONDI REFINERYBASIC ENGINEERING
2004ENI S.p.A. Div. REFINING & MARKETING
ITALYCOMPLETED
DOWNSTREAM/
REFINING
FCC GASOLINE HDS PLANT AT SANNAZZARO DE’ BURGONDI REFINERY - FINAL CLIENT: ENI R&M DIV.DETAILED DESIGN2003SNAMPROGETTI SUDITALYCOMPLETED
DOWNSTREAM/
REFINING
WAX VACUUM PLANT REVAMPING PROJECT AT LIVORNO REFINERYBASIC ENGINEERING & COST ESTIMATE2002Agip PetroliITALYCOMPLETED
DOWNSTREAM/
CHEMICAL
THIRD METHANOL PLANT, BANDAR IMAMDETAILED DESIGNED2002SNAMPROGETTIITALYCOMPLETED
DOWNSTREAM/
REFINING
TOPPING 2 (UNIT 10) REVAMPING AT SANNAZZARO DE’ BURGONDI REFINERY - FINAL CLIENT: AGIP PETROLIDETAILED DESIGNED2002SNAMPROGETTIITALYCOMPLETED
DOWNSTREAM/
REFINING
NEW LUBE OIL RE-REFINING (HYDRO-FINISHING) PLANT AND OFF-SITES REVAMPING AT PIEVE FISSIRAGA REFINERYFEASIBILITY STUDY, FEED, DETAIL ENGINEERING, COST ESTIMATE, PROCUREMENT, INSPECTION AND EXPEDITING OF MATERIALS2001VISCOLUBEITALYCOMPLETED