PROJECT CATEGORY | PROJECT DESCRIPTION | SCOPE OF WORK | YEAR | CLIENT | LOCATION | STATUS |
---|---|---|---|---|---|---|
POWER | ENERGY THERMAL STORAGE FOR CCGT PLANTS - COMPARISON OF DIFFERENT THERMAL STORAGE MEDIA | FEASIBILITY STUDY | 2021 | ENIPOWER | ITALY | COMPLETED |
POWER | NEW ELECTRICAL SUBSTATION SS51bis | BASIC DESIGN | 2020 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO REFINERY (ITALY) | COMPLETED |
POWER | ENERGY STORAGE SYSTEM BASED ON THERMAL BATTERIES (ENERGY NEST TECHNOLOGY) | FEASIBILITY STUDY | 2020 | ENIPOWER | FERRERA ERBOGNONE (ITALY) | COMPLETED |
POWER | EXPANSION OF OS-1 ELECTRICAL SUBSTATION | FEED (Front End Engineering Design) | 2018 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | REPLACEMENT OF 150 KV AIS (AIR INSULATED SWITCHYARD) | BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION SERVICES | 2017-2018 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | INSTALLATION OF N.2 NEW LJUNGSTROM AIR PRE-HEATERS AT REFINERY POWER STATION | FEED (Front End Engineering Design) | 2017 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | OKPAI POWER STATION CAPACITY INCREASE: 480 MW TO 960 MW | DETAIL ENGINEERING | 2017 | SAIPEM | OKPAI (NIGERIA) | COMPLETED |
POWER | REPLACEMENT OF AIR-PREHEATEARS AT POWER GENERATION PLANT (CTE) | FEASIBILITY STUDY | 2017 | SARLUX S.r.l. | SARROCH (CA), ITALY | COMPLETED |
POWER | REVAMPING OF ELECTRICAL SUBSTATIONS AT NORTH AND SOUTH PLANTS (JOB CARRIED OUT IN FOUR STEPS DURING 2016, 2017, 2018 AND 2019 TURNAORUNDS), INCLUDING: - REPLACEMENT OF MV SWITCHBOARDS - INSTALLATION OF MV VFD ON BOILER BLOWERS - REPLACEMENT OF LV SWITCHBOARDS (PC, MCC, AUXILIARY SERVICES) - INSTALLATION OF ELECTRICAL SCADA, UPS AND PROTECTION SWITCHBOARDS - INSTALLATION OF ELECTRICAL CABLES - CIVIL WORKS | BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION TO INSTALLATION | 2016-2019 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | NEW 150 KV ELECTRICAL SUBSTATION | DETAIL DESIGN | 2016 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | REPLACEMENT OF ELECTRICAL PROTECTION SWITCHBOARDS 150/33/6 KV | DETAIL DESIGN | 2015 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | REPLACEMENT OF FCC BLOWER DRIVER FROM STEAM TURBINE TO ELECTRICAL MOTOR | DETAIL DESIGN | 2015 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
POWER | RELOCATION OF SOLAR TAURUS 70 GAS TURBINE | PMC SERVICES | 2013 | E.ON | MIRA/ADRIA, ITALY | COMPLETED |
POWER | INSTALLATION OF N.2 NEW HP STEAM BOILERS (2 X 150 T/H), PORTO MARGHERA PETROCHEMICAL COMPLEX | BASIC ENGINEERING & COST ESTIMATE | 2011 | POLIMERI EUROPA | ITALY | COMPLETED |
POWER | 12 T POWER BOILERS SUBSTITUTION WITH 3.5 MW POWER BOILERS/ SOLAR CENTAURO 55 TURBOGAS AT ROBASSOMERO PLANT - FINAL CLIENT: ENI R&M DIV. | DETAILED ENGINEERING | 2007 | CO.ME.CF s.r.l. | ITALY | COMPLETED |
POWER | BOCAMINA II 370 MWE COAL FIRED POWER PLANT, PUERTO CORONEL - FINAL CLIENT: ENDESA | BASIC ENGINEERING & DETAILED ENGINEERING | 2007 | TECNIMONT | CHILE | COMPLETED |
POWER | REPLACEMENT OF STEAM GENERATORS AT EXISTING POWER PLANT | FEASIBILITY STUDY | 2006 | ENI S.p.A. Div. REFINING & MARKETING | ROBASSOMERO, ITALY | COMPLETED |
POWER | EPC FOR THE EXPANSION OF NAOC ELECTRICAL POWER PLANT | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2006 | ENI S.p.A. Div. EXPLORATION & PRODUCTION | OKPAI, NIGERIA | COMPLETED |
POWER | SUPPLY AND INSTALLATION OF A 3MW POWER PLANT FOR LOCAL COMMUNITY | FRONT END ENGINEERING DESIGN (FEED) AND PREPARATION OF TENDER DOCUMENTS | 2004 | ENI S.p.A. Div. EXPLORATION & PRODUCTION | OKPAI, NIGERIA | COMPLETED |
POWER | 3D MODELLING FOR THE OKPAI POWER PLANT | ELECTRO-INSTRUMENTAL ENGINEERING | 2003 | ALSTOM POWER BOILERS | NIGERIA | COMPLETED |
POWER | COMBINED HEAT & POWER PLANT – FINAL CLIENT: HICKSON & WELCH LTD | DETAIL DESIGN | 2001 | ENELPOWER | CASTLEFORD, UNITED KINGDOM | COMPLETED |