Renewable energies & energy transition
Energy Transition is the ongoing process aimed at replacing fossil fuels with Renewable Energies to produce electricity, fuels and the products we use in our everyday, while reducing global warming and pollution.
Energy Transition encompasses production of renewable energies such as solar, wind, hydroelectric and tidal power, use of biomasses and wastes as feedstocks for production of advanced bio-fuels, bio-plastics and bio-chemical products, as well as CO2 capture, storage and usage.
Hydrogen is one of the key tools in the Energy Transition. Hydrogen is a versatile, clean, and safe energy carrier that can be used as fuel for power or in industry as feedstock. It can be produced from renewable electricity (“green hydrogen”) and from carbon-abated fossil fuels (“blue hydrogen”). It produces zero emissions at point of use. It can be stored and transported at high energy density in liquid or gaseous form. It can be combusted or used in fuel cells to generate heat and electricity.
Energy Transition is linked with the Circular Economy model, which involves reusing and recycling existing materials and products in order to reduce the consumption of natural resources and the production of wastes.
Please see here below our reference list of projects in the Energy Transition sector.
PROJECT CATEGORY | PROJECT DESCRIPTION | SCOPE OF WORK | YEAR | CLIENT | LOCATION | STATUS |
---|---|---|---|---|---|---|
RENEWABLE ENERGIES/ ENERGY TRANSITION | PILOT PLANT FOR PRODUCTION OF GREEN HYDROGEN BY CATALYTIC PRYOLISIS OF BIOMETHANE | BASIC DESIGN | 2024 | ENI S.p.A. | ITALY | IN PROGRESS |
RENEWABLE ENERGIES/ ENERGY TRANSITION | GREEN HYDROGEN PLANT | FEED (Front End Engineering Design) | 2024 | SNAM | CONTURSI (ITALY) | IN PROGRESS |
RENEWABLE ENERGIES/ ENERGY TRANSITION | PRETREATMENT UNIT FOR UPGRADING OF BIO-FEEDSTOCKS FOR PRODUCTION OF BIOFUELS | FEED/ DETAIL DESIGN | 2024 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | IN PROGRESS |
RENEWABLE ENERGIES/ ENERGY TRANSITION | NEW LOADING ARMS AND REVAMPING OF JETTY TO INCREASE THE IMPORT/ EXPORT OF BIO-FEEDSTOCKS AND BIOFUELS | BASIC DESIGN | 2024 | BIORAFFINERIA DI GELA | GELA BIO-REFINERY (ITALY) | IN PROGRESS |
RENEWABLE ENERGIES/ ENERGY TRANSITION | CCS HUB FOR CO2 CAPTURE AND STORAGE | BASIC DESIGN/ FEED | 2024 | ENIPROGETTI/ ENI | RAVENNA (ITALY) | IN PROGRESS |
RENEWABLE ENERGIES/ ENERGY TRANSITION | PILOT PLANT FOR PRODUCTION OF e-SAF (SUSTAINABLE AVIATION FUEL) | FEED/ DETAIL DESIGN | 2024 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | IN PROGRESS |
RENEWABLE ENERGIES/ ENERGY TRANSITION | PROTOTYPE OF THERMAL REACTOR FOR PRE-TREATMENT OF BIOFEEDSTOCKS | BASIC DESIGN | 2024 | ENI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | CO2 CAPTURE PLANT (50 TPD) BASED ON CO2SOLUTIONS/ BLUENZYME TECHNOLOGY | FEED (Front End Engineering Design) | 2024 | SAIPEM | ROBASSOMERO (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | NEW PLANT FOR MECHANICAL RECYLE OF POLYSTYRENE | BASIC DESIGN | 2024 | VERSALIS | ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | ENERGY SAVINGS AT MANTOVA, FERRARA, FERRERA ERBOGNONE AND BRINDISI POWER PLANTS | FEED (Front End Engineering Design) | 2024 | ENIPOWER | ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | DEVELOPMENT OF A TOOL FOR CALCULATION OF PRODUCTION COST OF VARIOUS E-FUELS VS. CORRESPONDING FOSSIL FUELS | FEASIBILITY STUDY | 2024 | ENI S.p.A. | ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | ELECTRIFICATION OF PROCESS HEATERS AND REVAMPING OF EXISTING N-PARAFFINES PRODUCTION PLANT | FEASIBILITY STUDY | 2024 | SASOL | AUGUSTA (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | MODENA HYDROGEN VALLEY | FEED (Front End Engineering Design) | 2024 | SNAM/ HERA | MODENA (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | NEW WASTE PLASTIC RECYCLE PLANT | FEED (Front End Engineering Design) | 2023 | VERSALIS | PORTO MARGHERA (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | NEW GREEN HYDROGEN PLANT (5 MWe) FOR DECARBONIZATION OF REFINERY PROCESSES | FEASIBILITY STUDY | 2023 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | NEW MODULE FOR LNG LOADING/ UNLOADING OPERATIONS | FEED (Front End Engineering Design) | 2023 | GNL ITALIA | PANIGAGLIA LNG TERMINAL, FEZZANO (SP) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | PILOT PLANT FOR PRODUCTION OF e-SAF (SUSTAINABLE AVIATION FUEL) | FEASIBILITY STUDY | 2023 | SARAS | SARROCH REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | NEW PLANT FOR PRODUCTION OF GREEN HYDROGEN AND GREEN SYNTHESIS GAS | FEASIBILITY STUDY | 2023 | HYBLA CONSORTIUM | AUGUSTA (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | HYDROGEN VALLEY | FEASIBILITY STUDY | 2023 | SGI (SOCIETA' GASDOTTI ITALIA) | FROSINONE (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | REUSE OF COLUMN T-105 FOR PRODUCTION OF SAF (BIOJET) BY FRACTIONATION OF A BIO-NAPHTHA STREAM | BASIC DESIGN | 2023 | ENI | LIVORNO REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | GREEN HYDROGEN PRODUCTION PLANT FOR DECARBONIZATION OF TYLES PRODUCTION | FEASIBILITY STUDY | 2023 | SNAM | ITALY | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | SCREENING OF E-KEROSENE PRODUCTION TECHNOLOGIES FOR A PILOT PLANT FOR PRODUCTION OF e-SAF (SUSTAINABLE AVIATION FUEL) | FEASIBILITY STUDY | 2023 | POLENERGIA | POLAND | COMPLETED |
RENEWABLE ENERGIES/ ENERGY TRANSITION | GREEN HYDROGEN PLANT BASED ON 10 MWe ELECTROLYSER | FEASIBILITY STUDY | 2022 | SNAM | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | DISTILLATION OF A BIO-NAPHTHA STREAM TO PRODUCE BIO-JET USING AN EXISTING IDLE DISTILLATION COLUMN | PROCESS STUDY | 2021 | ENI S.p.a. | LIVORNO REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | DEBOTTLENECKING OF THE GAS RECOVERY SECTION TO ALLOW PRODUCTION OF BIOJET | PROCESS STUDY | 2021 | RAFFINERIA DI GELA | GELA REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW PELARGONIC ACID HYDROGENATION UNIT | DETAIL DESIGN | 2021 | MATRICA | PORTO TORRES (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | BLUE HYDROGEN PROJECT. NEW HYDROGEN GENERATION PLANT (50,000 NM3/H), BY STEAM REFORMING OF NATURAL GAS, INCLUDING CO2 CAPTURE SYSTEM | FEASIBILITY STUDY | 2021 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | FREE PALM OIL PROJECT - MODIFICATION OF REFINERY LOGISTIC ASSETS TO ALLOW STORAGE AND HANDLING OF SECOND GENERATION BIO-FEEDSTOCKS | BASIC DESIGN | 2021 | ENI S.p.a. | VENICE REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW PLANT FOR COMPRESSION AND LOADING OF GREEN H2 ON TUBE TRAILERS (CAPACITY: 800 Nm3/h) | FEASIBILITY STUDY | 2021 | SAPIO | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | SEMI-INDUSTRIAL PLANT FOR PRODUCTION OF SUBSTITUTE NATURAL GAS FROM GREEN HYDROGEN AND CO2 | FEASIBILITY STUDY | 2021 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | DEMO PLANT FOR PRODUCTION OF SUBSTITUTE NATURAL GAS FROM GREEN HYDROGEN AND CO2 | FEASIBILITY STUDY | 2021 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | ASSESSMENT OF SITES FOR PRODUCTION FOR HYDROELECTRIC POWER | TECHNICAL ADVISORY SERVICES | 2021 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PRETREATMENT OF WASTE VEGETABLE OILS (e.g. USED COOKING OIL AND PALM OIL MILL EFFLUENT) FOR PRODUCTION OF BIOFUELS | FEASIBILITY STUDY | 2021 | SARLUX S.r.l. | SARROCH REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW PROCESS HEATER FOR KEROSENE HYDRODESULPHURIZATION UNIT (HDS-1) | BASIC DESIGN | 2020 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | FEEDING SYSTEM FOR VEGETABLE OILS TO GASOIL HYDROTREATING UNIT | FEED (Front End Engineering Design) | 2020 | RAFFINERIA DI MILAZZO S.C.p.A. | MILAZZO REFINERY (ITALY) | IN PROGRESS |
RENEWABLE ENERGIES/ENERGY TRANSITION | BLUE HYDROGEN PROJECT. NEW HYDROGEN GENERATION PLANT (50,000 NM3/H) INCLUDING CO2 CAPTURE SYSTEM | FEASIBILITY STUDY | 2020 | ENIPROGETTI | ITALY | IN PROGRESS |
RENEWABLE ENERGIES/ENERGY TRANSITION | PRODUCTION OF BIO-METHANE BY UPGRADING OF BIOGAS PRODUCED FROM WASTES OF BIO-ETHANOL PRODUCTION PLANT | FEED (Front End Engineering Design) | 2020 | VERSALIS | CRESCENTINO (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW PLANT FOR RECOVERY OF METALS (NI, V, MO) FROM WASTE CATALYSTS | FEASIBILITY STUDY | 2020 | ORLEN POLUDNIE | TRZEBINIA (POLAND) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | GREEN MONOMER GRANULATION UNIT | FEED (Front End Engineering Design) | 2020 | MATRICA | PORTO TORRES (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | COLD EYE REVIEW OF BASIC DESIGN PACKAGE FOR NEW WASTE TO METHANOL PLANT | TECHNICAL ADVISORY SERVICES | 2020 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW PLANT, BASED ON ENI'S PROPRIETARY TECHNOLOGY, FOR PRODUCTION OF 150 KT/Y OF BIO-OIL FROM THE ORGANIC FRACTION OF MUNICIPAL SOLID WASTES | FEED (Front End Engineering Design) | 2020 | ENIPROGETTI | PORTO MARGHERA (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW CO2 CAPTURE UNIT (300 MTPD) DOWNSTREAM OF THE EXISTING STEAM METHANE REFORMING UNIT | FEASIBILITY STUDY | 2020 | ENI S.p.A. | SANNAZZARO REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PRODUCTION OF GREEN METHANOL FROM SYNGAS GENERATED FROM BIOGAS AMD GREEN HYDROGEN GENERATED BY ELECTROLYSIS | FEASIBILITY STUDY | 2019 | ENIPROGETTI | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PRE-TREATMENT UNIT FOR USED COOKING OIL (UCO) AND UNCONVENTIONAL FEEDSTOCKS AT ECOFINING PLANT FOR PRODUCTION OF HYDROGENATED VEGETABLE OILS (HVO). | BASIC DESIGN | 2019 | ENI S.p.A. | VENICE REFINERY (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | GREEN MONOMERS PRODUCTION PLANT. DEBOTTLENECKING OF N.2 PROCESS UNITS (U-2100, U-2200) | BASIC DESIGN, DETAIL DESIGN, CONSTRUCTION SUPERVISION | 2018 | MATRICA | PORTO TORRES (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW LPG FIRED-BOILER FOR GENERATION OF LOW-PRESSURE STEAM | BASIC DESIGN, PREPARATION OF TENDER DOCUMENT FOR EPC | 2018 | MATRICA | PORTO TORRES (ITALY) | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | 1,500 MTPY POLYHYDROXYALKANOATES (PHA) BIO-PLASTIC PRODUCTION PLANT FROM GLYCEROL FEEDSTOCK | FEASIBILITY STUDY | 2016 | BIO-ON | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | REVAMPING OF EXISTING TANK FARM FOR STORAGE OF RAW VEGETABLE OILS AND BIODIESEL | FEED | 2012 | ENI S.p.A. Div. REFINING & MARKETING | ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | INTEGRATION OF PV PLANT WITH DIESEL GENERATOR TO PROVIDE ELECTRICITY FOR WELL HEAD PUMPS AT AGIBA OIL FIELD | BASIC DESIGN | 2012 | ENIPOWER | EGYPT | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NEW 10,000 NM3/H CARBON DIOXIDE REMOVAL UNIT | DETAILED ENGINEERING, PROCUREMENT SERVICES & HOME OFFICE SERVICES | 2011 | DANIELI Far East | FAR EAST | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PHOTOVOLTAIC PLANT (2 MW) | BASIC DESIGN | 2010 | ENIPOWER | MELLITAH, LIBYA | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PHOTOVOLTAIC PLANT (1 MW) | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2010 | ENIPOWER | TARANTO, ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PHOTOVOLTAIC PLANTS ON SCHOOL ROOFTOPS (1 MW) | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2010 | ENIPOWER | ROMA, ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PHOTOVOLTAIC PLANT (4 MW) | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2010 | ENIPOWER | FERRANDINA, ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | PHOTOVOLTAIC PLANT (3,4 MW) | FRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS | 2010 | ENIPOWER | PISA, ITALY | COMPLETED |
RENEWABLE ENERGIES/ENERGY TRANSITION | NR. 2 BIOMASS FIRED POWER PLANTS (14 MW AND 10 MW) | CONCEPTUAL DESIGN & COST ESTIMATE | 2009 | SIRAM S.p.A. | ITALY | COMPLETED |
BIOMASS FIRED POWER PLANT, OLEVANO LOMELLINA | BASIC ENGINEERING | 2008 | TECNIMONT | ITALY | COMPLETED |