Power

Power

The Power sector covers all the plants, systems and equipment required for the generation, transmission, distribution and sale of electric power.
Please see here below our reference list of projects in the Power sector.

PROJECT CATEGORYPROJECT
DESCRIPTION
SCOPE OF WORKYEARCLIENTLOCATIONSTATUS
POWER ENERGY THERMAL STORAGE FOR CCGT PLANTS - COMPARISON OF DIFFERENT THERMAL STORAGE MEDIAFEASIBILITY STUDY2021ENIPOWERITALYCOMPLETED
POWER NEW ELECTRICAL SUBSTATION SS51bisBASIC DESIGN2020RAFFINERIA DI MILAZZO S.C.p.A.MILAZZO REFINERY (ITALY)COMPLETED
POWER ENERGY STORAGE SYSTEM BASED ON THERMAL BATTERIES (ENERGY NEST TECHNOLOGY)FEASIBILITY STUDY2020ENIPOWERFERRERA ERBOGNONE (ITALY)COMPLETED
POWER EXPANSION OF OS-1 ELECTRICAL SUBSTATION FEED (Front End Engineering Design)2018SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
POWER REPLACEMENT OF 150 KV AIS (AIR INSULATED SWITCHYARD)BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION SERVICES2017-2018SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
POWER INSTALLATION OF N.2 NEW LJUNGSTROM AIR PRE-HEATERS AT REFINERY POWER STATIONFEED (Front End Engineering Design)2017SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
POWER OKPAI POWER STATION CAPACITY INCREASE: 480 MW TO 960 MW DETAIL ENGINEERING2017SAIPEMOKPAI (NIGERIA)COMPLETED
POWER REPLACEMENT OF AIR-PREHEATEARS AT POWER GENERATION PLANT (CTE)FEASIBILITY STUDY2017SARLUX S.r.l.SARROCH (CA), ITALYCOMPLETED
POWER REVAMPING OF ELECTRICAL SUBSTATIONS AT NORTH AND SOUTH PLANTS (JOB CARRIED OUT IN FOUR STEPS DURING 2016, 2017, 2018 AND 2019 TURNAORUNDS), INCLUDING:
- REPLACEMENT OF MV SWITCHBOARDS
- INSTALLATION OF MV VFD ON BOILER BLOWERS
- REPLACEMENT OF LV SWITCHBOARDS (PC, MCC, AUXILIARY SERVICES)
- INSTALLATION OF ELECTRICAL SCADA, UPS AND PROTECTION SWITCHBOARDS
- INSTALLATION OF ELECTRICAL CABLES
- CIVIL WORKS
BASIC DESIGN, DETAIL DESIGN, INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT, SUPERVISION TO INSTALLATION2016-2019SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
POWER NEW 150 KV ELECTRICAL SUBSTATIONDETAIL DESIGN2016SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
POWER REPLACEMENT OF ELECTRICAL PROTECTION SWITCHBOARDS 150/33/6 KVDETAIL DESIGN2015SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
POWER REPLACEMENT OF FCC BLOWER DRIVER FROM STEAM TURBINE TO ELECTRICAL MOTORDETAIL DESIGN2015SARLUX S.r.l.SARROCH REFINERY (ITALY)COMPLETED
POWER RELOCATION OF SOLAR TAURUS 70 GAS TURBINEPMC SERVICES2013E.ON MIRA/ADRIA, ITALYCOMPLETED
POWER INSTALLATION OF N.2 NEW HP STEAM BOILERS (2 X 150 T/H), PORTO MARGHERA PETROCHEMICAL COMPLEXBASIC ENGINEERING & COST ESTIMATE2011POLIMERI EUROPAITALYCOMPLETED
POWER 12 T POWER BOILERS SUBSTITUTION WITH 3.5 MW POWER BOILERS/ SOLAR CENTAURO 55 TURBOGAS AT ROBASSOMERO PLANT - FINAL CLIENT: ENI R&M DIV. DETAILED ENGINEERING2007CO.ME.CF s.r.l.ITALYCOMPLETED
POWER BOCAMINA II 370 MWE COAL FIRED POWER PLANT, PUERTO CORONEL - FINAL CLIENT: ENDESABASIC ENGINEERING & DETAILED ENGINEERING2007TECNIMONTCHILECOMPLETED
POWER REPLACEMENT OF STEAM GENERATORS AT EXISTING POWER PLANTFEASIBILITY STUDY2006ENI S.p.A. Div. REFINING & MARKETINGROBASSOMERO, ITALY COMPLETED
POWER EPC FOR THE EXPANSION OF NAOC ELECTRICAL POWER PLANTFRONT END ENGINEERING DESIGN (FEED), COST ESTIMATE AND PREPARATION OF TENDER DOCUMENTS2006ENI S.p.A. Div. EXPLORATION & PRODUCTIONOKPAI, NIGERIACOMPLETED
POWER SUPPLY AND INSTALLATION OF A 3MW POWER PLANT FOR LOCAL COMMUNITYFRONT END ENGINEERING DESIGN (FEED) AND PREPARATION OF TENDER DOCUMENTS2004ENI S.p.A. Div. EXPLORATION & PRODUCTIONOKPAI, NIGERIACOMPLETED
POWER 3D MODELLING FOR THE OKPAI POWER PLANTELECTRO-INSTRUMENTAL ENGINEERING2003ALSTOM POWER
BOILERS
NIGERIACOMPLETED
POWER COMBINED HEAT & POWER PLANT – FINAL CLIENT: HICKSON & WELCH LTDDETAIL DESIGN2001ENELPOWERCASTLEFORD, UNITED KINGDOM COMPLETED

Do you need a high quality Engineering and Contracting company?